Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />SUBMITTAL PROCEDURES <br /> 01 33 00 - 6 <br /> <br /> <br />1. Type of product. Include unique identifier for each product indicated in the <br />Contract Documents or assigned by Contractor if none is indicated. <br />2. Manufacturer and product name, and model number if applicable. <br />3. Number and name of room or space. <br />4. Location within room or space. <br />E. Qualification Data: Prepare written information that demonstrates capabilities and <br />experience of firm or person. Include lists of completed projects with project names <br />and addresses, contact information of architects and owners, and other information <br />specified. <br />F. Design Data: Prepare and submit written and graphic information indicating <br />compliance with indicated performance and design criteria in individual <br />Specification Sections. Include list of assumptions and summary of loads. Include <br />load diagrams if applicable. Provide name and version of software, if any, used for <br />calculations. Number each page of submittal. <br />G. Certificates: <br />1. Certificates and Certifications Submittals: Submit a statement that includes <br />signature of entity responsible for preparing certification. Certificates and <br />certifications shall be signed by an officer or other individual authorized to <br />sign documents on behalf of that entity. Provide a notarized signature where <br />indicated. <br />2. Installer Certificates: Submit written statements on manufacturer's letterhead <br />certifying that Installer complies with requirements in the Contract <br />Documents and, where required, is authorized by manufacturer for this <br />specific Project. <br />3. Manufacturer Certificates: Submit written statements on manufacturer's <br />letterhead certifying that manufacturer complies with requirements in the <br />Contract Documents. Include evidence of manufacturing experience where <br />required. <br />4. Material Certificates: Submit written statements on manufacturer's letterhead <br />certifying that material complies with requirements in the Contract <br />Documents. <br />5. Product Certificates: Submit written statements on manufacturer's letterhead <br />certifying that product complies with requirements in the Contract <br />Documents. <br />6. Welding Certificates: Prepare written certification that welding procedures and <br />personnel comply with requirements in the Contract Documents. Submit <br />record of Welding Procedure Specification and Procedure Qualification Record <br />on AWS forms. Include names of firms and personnel certified. <br />H. Test and Research Reports: <br />1. Compatibility Test Reports: Submit reports written by a qualified testing <br />agency, on testing agency's standard form, indicating and interpreting results <br />of compatibility tests performed before installation of product. Include written <br />recommendations for primers and substrate preparation needed for adhesion. <br />2. Field Test Reports: Submit written reports indicating and interpreting results <br />of field tests performed either during installation of product or after product is <br />installed in its final location, for compliance with requirements in the Contract <br />Documents.