My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />PRODUCT REQUIREMENTS <br />01 60 00 - 2 <br /> <br /> <br />1. Include data to indicate compliance with the requirements specified in <br />"Comparable Products" Article. <br />2. Architect's Action: If necessary, Architect will request additional information <br />or documentation for evaluation within seven days of receipt of a comparable <br />product request. Architect will notify Contractor of approval or rejection of <br />proposed comparable product request within 10 days of receipt of request, or <br />seven days of receipt of additional information or documentation, whichever is <br />later. <br />a. Form of Architect's Approval of Submittal: As specified in <br />Section 01 33 00 "Submittal Procedures." <br />b. Use product specified if Architect does not issue a decision on use of a <br />comparable product request within time allocated. <br />B. Basis-of-Design Product Specification Submittal: Comply with requirements in <br />Section 01 33 00 "Submittal Procedures." Show compliance with requirements. <br />1.4 QUALITY ASSURANCE <br />A. Compatibility of Options: If Contractor is given option of selecting between two or <br />more products for use on Project, select product compatible with products <br />previously selected, even if previously selected products were also options. <br />1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. damage, deterioration, and loss, including theft and vandalism. Comply with <br />manufacturer's written instructions. <br />B. Delivery and Handling: <br />1. Schedule delivery to minimize long-term storage at Project site and to <br />prevent overcrowding of construction spaces. <br />2. Coordinate delivery with installation time to ensure minimum holding time for <br />items that are flammable, hazardous, easily damaged, or sensitive to <br />deterioration, theft, and other losses. <br />3. Deliver products to Project site in an undamaged condition in manufacturer's <br />original sealed container or other packaging system, complete with labels and <br />instructions for handling, storing, unpacking, protecting, and installing. <br />4. Inspect products on delivery to determine compliance with the Contract <br />Documents and to determine that products are undamaged and properly <br />protected. <br />C. Storage: <br />1. Store products to allow for inspection and measurement of quantity or <br />counting of units. <br />2. Store materials in a manner that will not endanger Project structure. <br />3. Store products that are subject to damage by the elements, under cover in a <br />weathertight enclosure above ground, with ventilation adequate to prevent <br />condensation.
The URL can be used to link to this page
Your browser does not support the video tag.