My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />EXECUTION <br />01 73 00 - 1 <br /> <br /> <br />SECTION 01 73 00 - EXECUTION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section includes general administrative and procedural requirements governing <br />execution of the Work including, but not limited to, the following: <br />1. Construction layout. <br />2. Field engineering and surveying. <br />3. Installation of the Work. <br />4. Cutting and patching. <br />5. Progress cleaning. <br />6. Starting and adjusting. <br />7. Protection of installed construction. <br />B. Related Requirements: <br />1. Section 01 10 00 "Summary" for limits on use of Project site. <br />1.2 INFORMATIONAL SUBMITTALS <br />A. Certificates: Submit certificate signed by professional engineer certifying that <br />location and elevation of improvements comply with requirements. <br />B. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to <br />accept hazardous materials, for hazardous waste disposal. <br />1.3 QUALITY ASSURANCE <br />A. Cutting and Patching: Comply with requirements for and limitations on cutting and <br />patching of construction elements. <br />1. Structural Elements: When cutting and patching structural elements, notify <br />Architect of locations and details of cutting and await directions from Architect <br />before proceeding. Shore, brace, and support structural elements during <br />cutting and patching. Do not cut and patch structural elements in a manner <br />that could change their load-carrying capacity or increase deflection. <br />2. Operational Elements: Do not cut and patch operating elements and related <br />components in a manner that results in reducing their capacity to perform as <br />intended or that results in increased maintenance or decreased operational <br />life or safety. <br />3. Other Construction Elements: Do not cut and patch other construction <br />elements or components in a manner that could change their load -carrying <br />capacity, that results in reducing their capacity to perform as intended, or <br />that results in increased maintenance or decreased operational life or safety.
The URL can be used to link to this page
Your browser does not support the video tag.