My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CONSTRUCTION PROGRESS DOCUMENTATION <br /> 01 32 00 - 4 <br /> <br /> <br />h. Environmental control. <br />i. Night work <br />E. Milestones: Include milestones indicated in the Contract Documents in schedule, <br />including, but not limited to, the Notice to Proceed, Substantial Completion, and <br />final completion, and the following interim milestones: <br />1. Temporary enclosure and space conditioning, when applicable <br />2. Anticipated inspection dates. <br />F. Upcoming Work Summary: Prepare summary report indicating activities scheduled <br />to occur or commence prior to submittal of next schedule update. Summarize the <br />following issues: <br />1. Unresolved issues. <br />2. Unanswered Requests for Information. <br />3. Rejected or unreturned submittals. <br />4. Notations on returned submittals. <br />5. Pending modifications affecting the Work and the Contract Time. <br />G. Contractor's Construction Schedule Updating: At monthly intervals, update <br />schedule to reflect actual construction progress and activities. Issue schedule one <br />day before each regularly scheduled progress meeting. <br />1. Revise schedule immediately after each meeting or other activity where <br />revisions have been recognized or made. Issue updated schedule concurrently <br />with the report of each such meeting. <br />2. Include a report with updated schedule that indicates every change, including, <br />but not limited to, changes in logic, durations, actual starts and finishes, and <br />activity durations. <br />3. As the Work progresses, indicate final completion percentage for each <br />activity. <br />H. Recovery Schedule: When periodic update indicates the Work is 10 or more <br />calendar days behind the current approved schedule, submit a separate recovery <br />schedule indicating means by which Contractor intends to regain compliance with <br />the schedule. Indicate changes to working hours, working days, crew sizes, <br />equipment required to achieve compliance, and date by which recovery will be <br />accomplished. <br />I. Distribution: Distribute copies of approved schedule to Architect Owner, separate <br />contractors, testing and inspecting agencies, and other parties identifi ed by <br />Contractor with a need-to-know schedule responsibility. <br />1. Post copies in Project meeting rooms and temporary field offices. <br />2. When revisions are made, distribute updated schedules to the same parties <br />and post in the same locations. Delete parties from distribution when they <br />have completed their assigned portion of the Work and are no longer involved <br />in performance of construction activities.
The URL can be used to link to this page
Your browser does not support the video tag.