My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />SUBMITTAL PROCEDURES <br /> 01 33 00 - 1 <br /> <br /> <br />SECTION 01 33 00 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Submittal schedule requirements. <br />2. Administrative and procedural requirements for submittals. <br />1.2 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that <br />require Architect's responsive action. Action submittals are those submittals <br />indicated in individual Specification Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples <br />that do not require Architect's responsive action. Submittals may be rejected for <br />not complying with requirements. Informational submittals are those subm ittals <br />indicated in individual Specification Sections as "informational submittals." <br />1.3 SUBMITTAL SCHEDULE <br />A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged <br />in chronological order by dates required by construction schedule. In clude time <br />required for review, ordering, manufacturing, fabrication, and delivery when <br />establishing dates. Include additional time required for making corrections or <br />revisions to submittals noted by Architect and additional time for handling and <br />reviewing submittals required by those corrections. <br />1.4 SUBMITTAL FORMATS <br />A. Submittal Information: Include the following information in each submittal: <br />1. Project name. <br />2. Date. <br />3. Name of Architect. <br />4. Name of Construction Manager. <br />5. Name of Contractor. <br />6. Name of firm or entity that prepared submittal. <br />7. Names of subcontractor, manufacturer, and supplier. <br />8. Unique submittal number, including revision identifier. Include Specification <br />Section number with sequential alphanumeric identifier; and alphanumeric <br />suffix for resubmittals. <br />9. Category and type of submittal. <br />10. Submittal purpose and description.
The URL can be used to link to this page
Your browser does not support the video tag.