My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br />01 50 00 - 10 <br /> <br /> <br />B. Maintenance: Maintain facilities in good operating condition until removal. <br />1. Maintain operation of temporary enclosures, heating, cooling, humidity <br />control, ventilation, and similar facilities on a 24-hour basis where required to <br />achieve indicated results and to avoid possibility of damage. <br />C. Temporary Facility Changeover: Do not change over from using temporary security <br />and protection facilities to permanent facilities until Substantial Completion. <br />D. Termination and Removal: Remove each temporary facility when need for its <br />service has ended, when it has been replaced by authorized use of a permanent <br />facility, or no later than Substantial Completion. Complete or, if necessary, restore <br />permanent construction that may have been delayed because of interference with <br />temporary facility. Repair damaged Work, clean exposed surfaces, and replace <br />construction that cannot be satisfactorily repaired. <br />1. Materials and facilities that constitute temporary facilities are property of <br />Contractor. Owner reserves right to take possession of Project identification <br />signs. <br />2. At Substantial Completion, repair, renovate, and clean permanent facilities <br />used during construction period. Comply with final cleaning requirements <br />specified in Section 01 77 00 "Closeout Procedures." <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.