Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br /> (305) 947-0606 phone (305) 949-3113 Fax <br /> 9. DEFECTIVE WORK <br /> 9.1 The City or its designee shall have the authority to reject or disapprove work <br /> which is found to be defective. If defective work is found, Contractor shall <br /> promptly either correct all defective work or remove such defective work and <br /> replace it with non-defective work. Contractor shall bear all direct and indirect <br /> costs of such removal or corrections including cost of testing laboratories and <br /> personnel. <br /> 9.2 Should Contractor fail or refuse to remove or correct any defective work or to make <br /> any necessary repairs in accordance with the requirements of this Agreement <br /> within the time indicated in writing by the City Manager or its designee, the City <br /> shall have the authority to cause the defective work to be removed or corrected, or <br /> make such repairs as may be necessary at Contractor's expense. Any expense <br /> incurred by the City in making such removals, corrections or repairs, shall be paid <br /> for out of any monies due or which may become due to Contractor. In the event of <br /> failure of Contractor to make all necessary repairs promptly and fully, which is not <br /> cured in the cure period,the City may declare Contractor in default. <br /> 9.3 If, within one (1) year after the date of completion of Services or such longer <br /> period of time as may be prescribed by the terms of any applicable special <br /> warranty required by the Contract Documents, or by any specific provision(s) of <br /> this Agreement, any of the work is found to be defective or not in accordance with <br /> this Agreement,Contractor,after receipt of written notice from the City or its designee, <br /> shall promptly correct such defective or nonconforming work within the time specified <br /> by the City without cost to the City.Nothing contained herein shall be construed to <br /> establish a period of limitation with respect to any other obligation which <br /> Contractor might have under this Agreement including but not limited to any claim <br /> regarding latent defects. <br /> 9.4 Failure to reject any defective work or material shall not in any way prevent <br /> later rejection when such defect is discovered, or obligate the City to final <br /> acceptance. <br /> 9.5 Where the City or its designee becomes aware of faults,defects or non-conformity <br /> in any of the work provided under this Agreement or with the work being <br /> performed by the Contractor, the City or its designee shall issue a Notice to Cure <br /> to the Contractor for correction. In no event shall the failure of the City or its <br /> designee to bring to the attention of the Contractor of such faults act as a waiver or <br /> release the Contractor from responsibility or liability for such fault, defect or non- <br /> conforming work. <br /> 10. TERMINATION AND REMEDIES FOR BREACH. <br /> A. If, through any cause within reasonable control, the Contractor shall fail to fulfill in a <br /> timely manner or otherwise violate any of the covenants, agreements or stipulations <br /> 5 <br /> 7053-034-AZULEJO,INC. <br />