My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Emerald
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:22:02 PM
Creation date
3/13/2019 4:19:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1211 Stirling Rd., Suite #106, Dania Beach, Florida 33004 <br />954.241.2583 | FAX: 954.241.2586 | CGC1518475 <br />WWW.EMERALDCONSTRUCTIONCORP.COM <br /> <br /> <br />Page 5 of 5 <br /> <br />• Add to the bid $2,800 to replace standard key/switch of the Bifold glass Overhead Glass <br />Door with LCD Touch Screen Control <br />• Deduct $10,000 to replace cast iron and copper with PVC <br /> <br />GENERAL EXCLUSIONS: <br /> <br />• Television/cable are not included <br />• Fire Alarm Monitoring Fees <br />• Security Guard fees <br />• Public Works Permit Fees <br />• Permit Fees <br />• Inspection Fees <br />• Weekends and nightshift <br />• Builders Risk Insurance <br />• Trash room- details are not provided <br /> <br />CONSTRUCTION SCHEDULE <br /> <br />• The proposed construction schedule for this project is or 303 days from permit <br />approval to completion. Regular working hours are included, weekend and night <br />shifts are not included in this proposal. Temporary water and electrical to be <br />provided by the owner. <br /> <br /> <br />PAYMENT SCHEDULE <br /> <br />• G.C. has assumed all requisitions to be submitted on the 25 th day of each month or as <br />mutually agreed upon contract award. All requisitions must be paid no later than 10 net <br />days from requisition submittal. <br /> <br />WARRANTY <br /> <br />• The contractor will warrant all work performed for a period of 1 year from the date of <br />substantial completion or the date the work is completed and accepted by the owner. Items <br />under warranty will include equipment and or material and installation installed by the <br />contractor. Equipment and or material installed will be repaired due to regular wear and <br />tear and or owner’s responsibility to perform required maintenance on items. Equipment <br />provided by owner and installed by the contractor will only warranty the installation.
The URL can be used to link to this page
Your browser does not support the video tag.