Laserfiche WebLink
CONSTRUCTION DOCUMENT <br />FOR <br />SIB - GA TI= WA V PARK <br />SUNNY ISLES BEACH, FLORIDA <br />LEVEL DESCRIPTION <br />D2010 PLUMBING FIXTURES <br />TOTAQUANTITY UNIT <br />'$117,000 100 EA <br />UNIT COST <br />$1,170 <br />— <br />-D2020 DOMESTIC WATER DISTRIBUTION <br />1$110,000 <br />100 �EA <br />1$1,100 <br />PIPES & FITTINGS <br />1$75,000 <br />100 EA <br />$750 <br />VALVES& HYDRANTS <br />$10,000 <br />100 �EA <br />$100 <br />DOMESTIC WATER EQUIPMENT <br />$7,000 <br />100 EA <br />$70 <br />INSULATION & IDENTIFICATION <br />$18,000 <br />100 EA <br />$180 <br />D2030 SANITARY WASTE <br />$83,000 <br />100 EA <br />$830 <br />WASTE PIPE &FITTINGS <br />_ <br />$63, 000 <br />100 EA <br />$630 <br />FLOOR DRAINS <br />$20,000 <br />12 EA <br />1$1,666.67 <br />D30 HVAC <br />$932,000 <br />15000 SF <br />$62.13 <br />D3040 DISTRIBUTION SYSTEMS <br />$489,000 <br />15000 SF <br />$32.60 <br />AIR DISTRIBUTION, HEATING & COOLING <br />$420,000 <br />15000 SF <br />$28 <br />EXHAUST SYSTEMS <br />•$69,000 <br />15000 SF <br />D3050 TERMINAL & PACKAGE UNITS <br />$350.000 <br />15000 SF <br />$23.33 <br />ROOFTOP UNITS <br />$300,000 <br />EA <br />$37,500 <br />D3060 CONTROLS & INSTRUMENTATION <br />$75,000 <br />15000 SF <br />$5 <br />HVAC CONTROLS <br />$70,000 <br />EA <br />$70,000 <br />D3070 SYSTEMS TESTING & BALANCING <br />$18,000 <br />SF <br />AIR SIDE TESTING & BALANCING - HEATING, <br />COOLING & EXHAUST $12,000:::::::: <br />EA <br />F1=1 <br />$12,000 <br />HVAC COMMISSIONING <br />$6,000 <br />11 LS <br />$6,000 <br />D40 FIRE PROTECTION <br />$20,000 <br />15000 SF <br />$1.33 <br />-D4010 SPRINKLERS <br />$20,000 <br />15000 SF <br />$1.33 <br />SPRINKLERS AND RELEASING DEVICES <br />$18,000 <br />15000 SF <br />$1.20 <br />050 ELECTRICAL <br />$910,000 <br />15000 SF <br />$60.67 <br />ELECTRIC POWER AND LIGHTING <br />$705,000 <br />15000 I� SF <br />1 <br />$47 <br />Report Date <br />