My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc - Gateway Park Center Bid 19-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Azulejo Inc - Gateway Park Center Bid 19-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:30:56 PM
Creation date
3/13/2019 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIAMI-DADE COUNTY, FLORIDA, <br />M IAM I-DADE I Capital Improvements Information System <br />$ Parks, Recreation and Open Spaces <br />Contractor Evaluation <br />MCC Contract: PR 154151 Evaluation Type: Standard Evaluation <br />Contractor: AZULEJO INC FEIN: 421586175 <br />Department Contact: Ruben Teurbe-Tolon 305-755-7985 Award Amount; $124,749.00 <br />Site Project Name: Partners Park - Walkway and Ballfield Improvements <br />Site Location: 5536 NW 21 Ave <br />Evaluator ID: rttolon <br />Date: 10/19/2018 <br />Period: Interim <br />Overall Performance Average: 3;9 <br />Documentation that supports this evaluation and Contractor's/Consultant's comments can be obtained by <br />contacting: <br />Ruben Teurbe-Toion at Phone/1305-755-7985 <br />Evaluation Reviewed by: Supervisor Cil Division Chief ❑ Assistant Director ❑ Director ❑ <br />Reviewer Name: Joel Arango Reviewer Signature: <br />The method of delivery of this evaluation to contractor/consultant: Certified Mail ❑ EMail ❑ Fax 2 <br />Hand O <br />(Unresponsive Performance by contractor/consultant requires 2 delivery methods, one MUST be Certified Mail.) <br />criteria _ - i <br />_JDOC� <br />1- <br />Schedule - Quality of schedule & adherence to schedule <br />resulting in timeliness and minimizing delay to the owner and <br />community. <br />Cost effectiveness &efficiency -Budget compliance &value of <br />work. <br />I3- <br />___ <br />Vision - Design - Concepts or adherence to criteria <br />Cooperation -Teamwork &relationship with owner, subs and <br />u <br />suppliers. <br />Coordination - Ability to organize, schedule and complete <br />tasks in adherence to the schedule._ <br />6- <br />.1 <br />Accuracy & Technical Skills - Cost estimating, scheduling, <br />shop and other drawings, plans, manuals, project <br />documentation and conflict resolution. <br />Completeness -Compliance with contract documents, permits, <br />���❑�� <br />Codes &standards. <br />Responsiveness - Timely, clear &concise responses to owner <br />comments and correspondence. <br />Commitment - Intangibles & contribution to project success. <br />Personnel -Quality and dedication of ro"ect staff. <br />Management - Leadership ability, <br />12- ®= <br />[== <br />Quality - Work performed correctly the first time. <br />Overall Performance Average: 3;9 <br />Documentation that supports this evaluation and Contractor's/Consultant's comments can be obtained by <br />contacting: <br />Ruben Teurbe-Toion at Phone/1305-755-7985 <br />Evaluation Reviewed by: Supervisor Cil Division Chief ❑ Assistant Director ❑ Director ❑ <br />Reviewer Name: Joel Arango Reviewer Signature: <br />The method of delivery of this evaluation to contractor/consultant: Certified Mail ❑ EMail ❑ Fax 2 <br />Hand O <br />(Unresponsive Performance by contractor/consultant requires 2 delivery methods, one MUST be Certified Mail.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.