My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc - Gateway Park Center Bid 19-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Azulejo Inc - Gateway Park Center Bid 19-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:30:56 PM
Creation date
3/13/2019 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />azug!o <br />contractor <br />Anticipated <br />to Complete <br />June 2019 <br />Page 1 of 3 <br />20200 West Dixie Hwy. Suite 805-A <br />Aventura, FI 33180 <br />(305)895-4110 Fax (786) 916-3916 <br />Contractor's on-going construction projects: <br />PROJECT NAME / PROJECT <br />OWNER COST <br />Palm Tower $1,125,135 <br />Windows <br />Replacement <br />SCOPE OF WORK <br />Project consists of the <br />following: <br />- New typical apartment <br />windows (provide at all <br />apartment windows) install <br />with all elements on the project <br />plans and specs. <br />- A/C wall units: General <br />repair, tune up and clean A/C. <br />- Remove all the hurricane <br />shield systems installed <br />currently covering the existing <br />windows and storefront <br />windows. <br />- Stucco and/or concrete <br />repair, as result of the <br />hurricane shield system <br />removal. <br />- New store front system. <br />Existing storefronts at <br />entrance lobby and <br />recreational room to be <br />replaced. <br />- Rusted doors and frames. <br />Sand and repaint. <br />- New Laundry area window. <br />Install with all elements <br />- Rusted metal fence and <br />metal door fence. Sand and <br />repaint with electrostatic paint. <br />- Replacement of matching <br />ceramic tile from window sill. <br />Include allowance price on a <br />per unit basis and include in <br />bid indicated quantity. Refer to <br />plans and specification. <br />- Provide alternate bid price <br />removing all ceramic tile <br />window sill and replacement <br />with standard %2" thick Carrara <br />marble sill in section not larger <br />NAME TO <br />ATTEST <br />Jorge Zaldivar <br />(786)469.4129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.