My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc - Gateway Park Center Bid 19-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Azulejo Inc - Gateway Park Center Bid 19-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:30:56 PM
Creation date
3/13/2019 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
azu1i jo <br />contractor <br />01/01/2017 <br />06/30/2016 <br />01/2014 <br />to <br />04/2016 <br />Page 6 of 11 <br />20200 West Dixie Hwy. Suite 805-A <br />Aventura, FI 33180 <br />(305)895-4110 Fax (954) 454-9424 <br />UFAS ADA Upgrades <br />at Phyllis Wheatley <br />and ABE Arronovitz <br />Buildings. <br />Miami -Dade Public <br />Housing and <br />Community <br />Development. <br />Miami, FI <br />$332,577 <br />Provide accessibility for the <br />physically impaired standards to 9 <br />units scattered around two sites. <br />Site accessibility including concrete <br />walkway and ramps connecting <br />daily use facilities to each unit's <br />front and rear doors. Complete <br />ADA interior upgrades of all the <br />units. <br />Project Size: Approx. 30,000 SQ f <br />Expedited <br />$228,000 <br />The purpose of Expedited Work <br />Maintenance work <br />Order Contract -1 was to complete <br />order contract. <br />emergency miscellaneous calls like: <br />Miami, FI <br />unblocking plumbing stoppages, <br />repair/replacement of plumbing <br />fixtures, repair/replacement of <br />light fixtures, switches, outlets, <br />space heaters, appliance repair <br />(stoves, refrigerators), roof <br />patching, interior door <br />repair/replacement, <br />repair/replacement of broken glass <br />and window valances, interior <br />wall/ceiling patching and painting, <br />repair/replace flooring, <br />repair/replace ceramic tile, replace <br />thresholds and weather seals, <br />securing kitchen cabinets, cove <br />base repair/replacement, stair <br />risers repairs/replacement, tree <br />trimming, door hardware, <br />acoustical ceiling tiles replacement, <br />smoke detectors replacement, etc. <br />Shut-off all existing utilities services <br />Easterlin Park <br />$908,799.19 <br />Administration <br />to existing building, restroom and <br />Building. <br />gatehouse. Cap all pipes leading <br />Oakland Park, FI <br />into and out of buildings. <br />Disconnect electrical service. <br />Demolition of existing buildings, <br />including the existing ticket booth, <br />existing restroom and existing <br />administration building. <br />Construction of new building. New <br />walkways, driveways, and parking <br />areas. New utilitv connections. <br />Jorge Zaldivar <br />(786)469.4129 <br />Jzald@miamidade.g <br />ov <br />Lissette Martinez <br />(786)469.4127 <br />Lissette.Martinez@ <br />miamidade.gov <br />Brad Terrier <br />(954) 577.4577 <br />titer rierC&broward.arg <br />
The URL can be used to link to this page
Your browser does not support the video tag.