My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc - Gateway Park Center Bid 19-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Azulejo Inc - Gateway Park Center Bid 19-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:30:56 PM
Creation date
3/13/2019 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />4b%% .cuu <br />amu o <br />Ir Io <br />contractor <br />4/25/2013 <br />Page 9 of 11 <br />Florida International <br />University. Miami FI <br />VA Upgrade Finishes <br />Corridors Floors 1 <br />thru 3. <br />Veteran Hospital <br />Miami, FI <br />Reconfigure Space <br />in OPS Building. <br />USCG Miami Beach <br />Station <br />Modifications at <br />John Pennekamp <br />State Park. <br />Key Largo, FI. <br />$1,375,221 <br />$745,000 <br />20200 West Dixie Hwy. Suite 805-A <br />Aventura, FI 33180 <br />(305)895-4110 Fax (954) 454-9424 <br />bathrooms, Tie-in Plumbing, <br />Electrical and HVAC to FIU main <br />service, New Plumbing, Electrical. <br />HVAC, (including ducts), Fire Alarm, <br />Walls, Ceiling, Tiling floor and walls, <br />Doors, Toilet partitions, Installation <br />of all new fixtures and accessories. <br />Phased construction comprised of <br />10,000 sf. <br />Phased completion of Hospital <br />Corridor Renovation while Hospital <br />operations fully maintained. <br />Upgrade all finishes at walls, floors, <br />ceilings, millwork, Electrical, <br />plumbing, HVAC, and fire <br />sprinklers. <br />Project Size: 15,000 SQ <br />Remove roll -up doors and provide <br />staked concrete masonry units and <br />aluminum window with hurricane <br />shutters. New partition walls. <br />Supply and install ceramic tile and <br />base, provide and install acoustical <br />ceiling grid and tiles. Provide and <br />install new HVAC system. Provide <br />and install new hollow metal doors. <br />Provide and install metal deck with <br />2" concrete flooring covered with <br />VCT and carpet as required, paint <br />new metal doors, provide new <br />bond beam and CMU exterior wall <br />over roll -up doors. Reconfigure 2 <br />floors bays used as a shop, and <br />covert into air conditioning 2"d <br />floor offices. Upgrade all electrical <br />panels and gas lines. _ <br />Restoration of Visitors Center, <br />Diving Shop, Observatory. Upgrade <br />bathrooms to ADA compliance, <br />Build ADA ramps, railing and <br />Parking. Replace windows and <br />build new metal roof at the <br />bathhouse, Build over 2,000LF of <br />side walk. <br />Project Size: 6,100 SQ <br />Steven Dunn <br />(813)4764378 <br />Email: <br />Sherry Dague <br />(305)278.6721 <br />sherry. c.dague@usc <br />g.mil <br />Mike Renard <br />(850) 488.5372 <br />Email: <br />
The URL can be used to link to this page
Your browser does not support the video tag.