My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc - Gateway Park Center Bid 19-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Azulejo Inc - Gateway Park Center Bid 19-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 4:30:56 PM
Creation date
3/13/2019 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- � � ■ IIYL.CDP1 <br />azul jo <br />contractor <br />20200 West Dixie Hwy. Suite 805-A <br />Aventura, FI 33180 <br />(305)895-4110 Fax (954) 454-9424 <br />2008 <br />Atkins Courthouse <br />$472,000 <br />US Marshalls clearance required, <br />Lydia Domenech <br />Miami, FI <br />Interior Renovations in 9" floors of <br />(202)5010543 <br />building. <br />lydia.domenech@gsa <br />Replace carpet, wall papers, Add <br />v <br />insulation panels in Jury Chambers, <br />Courtrooms and Administrative <br />Offices. Restore and stain wood <br />panels and chair rails of Jury stage. <br />Relocate electrical outlets, lighting, <br />smoke detectors and fire strobes <br />with the new layout. Relocate <br />sprinklers heads. Install VCT and <br />paint. <br />Furnish and install quantity of 17 <br />Chris Harris <br />2008 <br />Planters and <br />$250,000 <br />Bollards at Brickell <br />rectangular planters on the front <br />(305) 536-5751 <br />Federal Building, <br />(west) side of <br />lenita.harris@gsa.gov <br />USCG - Miami, FI <br />the building and 2 rectangular <br />planters on the south side of the <br />building. Planter <br />size is 96" long x 48" wide x 36" high, <br />each weighing 4,300 pounds. <br />Total weight 81,700 pounds. <br />Furnish and install 97 each <br />Removable Bollards on the back <br />(east) side of the <br />building, each weighing 310 <br />pounds. Total weight 30,070 <br />pounds. <br />2007 <br />USCG CEU Miami <br />$233,749 <br />Replacement of Emergency <br />Sherry Dague <br />Replacement <br />Generator <br />(305)2786721 <br />Emergency <br />sherry. c.dague@uscg.. <br />Generator. Miami, FI <br />Lead Abatement on over 100 <br />I <br />Steve Chan <br />2006 <br />Key West Naval <br />$437,350 <br />Base <br />houses. Install new VCT flooring. <br />(305)2932902 <br />VCT Replacement <br />Custom build new baseboards and <br />ChanST@efdsouth.nz� <br />Approx. 100 <br />moldings. Replace windows and <br />ac.navy.mil <br />Housing Units. <br />doors. Paint interior and exterior. <br />Key West, FI. <br />Project Size: 60,000 SQ <br />—J <br />Page 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.