|
CONSTRUCTION DOCUMENT
<br />FOR
<br />,51B - GATEWAY PARK
<br />SUNNY ISLES BEACH, FLORIDA
<br />LEVEL DESCRIPTION
<br />- CITY OF SUNNY ISLES BEACH - GATEWAY PARK
<br />T MAIN PROJECT
<br />1 BASE BID - CONSTRUCTION
<br />lA BUILDING CONSTRUCTION
<br />+A10 SUBSTRUCTURE
<br />+B20 EXTERIOR ENCLOSURE
<br />r C10 INTERIOR CONSTRUCTION
<br />+C30 INTERIOR FINISHES
<br />+ D20 PLUMBING
<br />+ D30 HVAC
<br />D40 FIRE PROTECTION
<br />r 050 ELECTRICAL
<br />+E10 EQUIPMENT & FURNISHINGS
<br />+ F20 SELECTIVE BUILDING DEMOLITION
<br />1B KITCHEN EQUIPMENT
<br />- 2 AUDIOVISUAL
<br />2A AUDIOVISUAL INFRASTRUCTURE
<br />2B AUDIOVISUAL EQUIPMENT
<br />3 LOOSE FURNITURE
<br />- ADDITIONAL
<br />- 4 KIOSK FLAN
<br />+4A KIOSKCONSTRUCTION
<br />4B KIOSK EQUIPMENT
<br />5 HALLWAY FINISH
<br />STUCCO & PATCH CEILING
<br />6 STORAGE ROOM
<br />A10300201 6" THICK SLAB ON GRADE
<br />A101091 GRADE BEAMS
<br />A10300201 RAMP
<br />+ B20 EXTERIOR ENCL05URE
<br />TOTAL QUANTITY UNIT
<br />$6,632,750 Is
<br />$5,810,000 Fl---�QLS
<br />$4,960,000 115000 =F
<br />$4,720,000 15000 I- t F
<br />$380,000 15000 �F
<br />$10,000 15000 �F
<br />$710,000 15000 �F
<br />$1,173,000 15000F
<br />$310,000 15000 F
<br />$932,000 15000 �F
<br />$20,000 15000 �F
<br />$910,000 15000 �F
<br />$200,000 15000 �F
<br />$75,000 15000 =F
<br />$240,000 00LS
<br />$525,000 =Ls
<br />$240,000 1 LS
<br />$285,000 �� LS
<br />$325,000 00Ls
<br />1.$822,750 =Ls
<br />$240,500 500 =F
<br />UNIT COST
<br />S 6,632,750
<br />S 5,810,000
<br />S 330.67
<br />S 314,67
<br />S 25.33
<br />S X0.67
<br />g 47.33
<br />$ 78.20
<br />$_20.67
<br />5 X62.13
<br />S 60.67
<br />S 13.33
<br />S 240,000
<br />$ � 525,000
<br />S 240,000
<br />S :285,000
<br />S 325,000
<br />$ 822,750
<br />$221,500 500 �SF $ 443
<br />1.$19,000 =Is 5 19,000
<br />$23,000 SF $ 15.33
<br />1.$13,000 1500 =F s 8'67
<br />$260,250 1000 �I;
<br />$52,000 1000 �F
<br />$65,000 140 11 Ky
<br />$15,000 1000 �F
<br />$20,000 100 �F
<br />
|