My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nunez Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Nunez Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 11:14:17 AM
Creation date
3/14/2019 12:20:28 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11100 <br /> AY <br /> IIIV <br /> CONSTRUCTION DOCUMENT <br /> lir FOR <br /> SIB-GATEWAY PARK <br /> 4W SUNNY ISLES BEACH,FLORIDA <br /> Itii <br /> lir <br /> lir LEVEL DESCRIPTION TOTAL QUANTITY UNIT UNIT COST <br /> - CITY OF SUNNY ISLES BEACH -GATEWAY PARK $5,229,215.00 <br /> 14110, <br /> - MAIN PROJECT $4,960,915.00 <br /> Ilir <br /> -1 BASE BID-CONSTRUCTION $4,041,215.00 I SF $ <br /> I, <br /> -1A BUILDING CONSTRUCTION $4,008,815.00 I <br /> 111, SF $ <br /> +A10 SUBSTRUCTURE $325,000.00 I SF $ <br /> ill, +B20 EXTERIOR ENCLOSURE $4,000.00 I SF $ <br /> it, +C10 INTERIOR CONSTRUCTION $810,200.00 I LF $ <br /> ‘ +C30 INTERIOR FINISHES $859,765.00 I IsF $ <br /> MP +D20 PLUMBING $180,450.00 I $ <br /> SF <br /> +D30 HVAC $654,700.00 I SF $ <br /> If <br /> 110. <br /> +D40 FIRE PROTECTION <br /> $77,000.00 I SF $ <br /> Iv <br /> +D50 ELECTRICAL $1,015,700.00 I ISF $ I <br /> 11110 <br /> +E10 EQUIPMENT&FURNISHINGS $64'500IP '00 I SF $ <br /> +F20 SELECTIVE BUILDING DEMOLITION $17,500.00 I ISF $ <br /> ' ► 1B KITCHEN EQUIPMENT $32,400.00 LS $ <br /> -2 AUDIO VISUAL $590,000.00 <br /> �LS $ <br /> ilir 2A AUDIO VISUAL INFRASTRUCTURE $155,000.00 I I-713 $ <br /> 10 2B AUDIO VISUAL EQUIPMENT $435,000.00 �LS <br /> $ <br /> 41110 3 LOOSE FURNITURE $329,700.00 <br /> - ADDITIONAL $268,300.00 I i Ls $ <br /> 11110 <br /> $77,300.00 <br /> IIIW -4 KIOSK PLAN I SF $ <br /> iiir +4A KIOSK CONSTRUCTION $67,800.00 I <br /> SF $ <br /> 4B KIOSK EQUIPMENT $9,500.00 III $ <br /> iir -5 HALLWAY FINISH $3,500.00I <br /> SF $ <br /> lir STUCCO&PATCH CEILING $3,500.00 I SF $ <br /> iiv <br /> -6 STORAGE ROOM $64,600.00 ( ISF $ <br /> iir <br /> A10300201 6"THICK SLAB ON GRADE $16,500.00 SF $ <br /> VW <br /> A101091 GRADE BEAMS $2,500.00 ICY $ <br /> A10300201 RAMP $2,100.00 I SF $ <br /> +B20 EXTERIOR ENCLOSURE $15,500.00 I SF $ <br /> iblr <br /> Report Date: <br /> 411. <br /> v,.;e NO 1 c,l <br />
The URL can be used to link to this page
Your browser does not support the video tag.