Laserfiche WebLink
r <br /> IIor CONSTRUCTION DOCUMENT <br /> iiir FOR <br /> SIB-GATEWAY PARK <br /> Alio SUNNY ISLES BEACH,FLORIDA <br /> 401, <br /> LEVEL DESCRIPTION TOTAL UANTITY UNIT UNIT COST <br /> 'V - CITY OF SUNNY ISLES BEACH -GATEWAY PARK $ r L —$1 <br /> — MAIN PROJECT $4,960,915.00 <br /> LS $ <br /> r -1 BASE BID-CONSTRUCTION $4,041,215.00 SF <br /> $ <br /> -1A BUILDING CONSTRUCTION $4,008,815.00 SF $ <br /> 4 <br /> -A10 SUBSTRUCTURE $325,000.00 1 17,039 SF $ 20.54 <br /> 1111110 <br /> II8Y A10300201 81/4"THICK SLAB ON GRADE $210,00.00 1 14,000 SF $ 15.00 <br /> A10300201 THICKENED SLAB $115,000.00 1 200 .y $ 575.00 <br /> 4111, <br /> -B20 EXTERIOR ENCLOSURE $4,000.00 1 SF $ 4,000.00 <br /> LL <br /> VP EXTERIOR DOORS $4,000.00 1 - :A $ 4,000.00 <br /> OSP 810,200.00 SF $ <br /> -C10 INTERIOR CONSTRUCTION <br /> C1010 FIXED PARTITIONS $317,200.00 SF $ <br /> VIP DRYWALL PARTITIONS $265,200.00 1 114,117 $F $ 18.79 <br /> GLAZED PARTITIONS $52,000.00 1 11,3000 SF $ 40.00 <br /> Illy <br /> -C1020 INTERIOR DOORS $191,500.00 EA $ <br /> GLAZED DOORS $19,000.00 1 1 :A $ 19,000.00 <br /> iiilw <br /> HM/SCW DOORS $123,000.00 1 1 :A $ 123,000.00 <br /> 1111, <br /> 4000, TELESCOPING DOORS $14,000.00 1 1 :A $ 14,000.00 <br /> 4 BIFOLD DOORS $8,500.00 1 1 :A $ 8,500.00 <br /> ADDITIONAL DOOR HARDWARE $27,000.00 1 11 _A $ 3,000.00 <br /> iir -01030 SPECIALTIES $301,500.00 SF $ <br /> RESTROOM SPECIALTIES $38,500.00 1 1 LS $ 38,500.00 <br /> CASEWORK/MILLWORK $120,000.00 1 400 <br /> LF $ 300 <br /> P-LAM STORAGE $95,000.00 <br /> 1 EA $ 95,000.00 <br /> tilir <br /> MISC INTERIOR SPECIALTIES $48,000.00 1 SF 548,000.00 <br /> C30 INTERIOR FINISHES $859,765.00 SF $ <br /> Report Date: <br /> +fir <br />