|
IOW
<br /> CONSTRUCTION DOCUMENT
<br /> Apo FOR
<br /> SIB-GATEWAY PARK
<br /> 11111, SUNNY ISLES BEACH,FLORIDA
<br /> lir
<br /> wily
<br /> LEVEL DESCRIPTION TOTAL( QUANTITY UNIT UNIT COST
<br /> D2010 PLUMBING FIXTURES $37,450.00 I EA $
<br /> $59,000.00
<br /> $
<br /> tillir
<br /> it PIPES&FITTINGS $45,000.00 1 EA $45,000.00
<br /> VALVES&HYDRANTS $5,000.00 1 EA $5,000.00
<br /> iiily
<br /> $5,000.00
<br /> DOMESTIC WATER EQUIPMENT 1 EAIV
<br /> $5,000.00
<br /> lir INSULATION&IDENTIFICATION $4,000.00 1 $4,000.00
<br /> EA
<br /> 02030 SANITARY WASTE $$4,000.00 EA $
<br /> iiir
<br /> $69,000.00
<br /> WASTE PIPE&FITTINGS 1 EA4111,
<br /> $69,000.00
<br /> Il
<br /> FLOOR DRAINS $15,000.00 1 EA $15,000.00
<br /> I' $654,700.00 SF $
<br /> -D30 HVAC
<br /> 41110
<br /> $355,000.00
<br /> lir -D3040 DISTRIBUTION SYSTEMS SF $
<br /> V AIR DISTRIBUTION,HEATING&COOLING $290,000.00 1
<br /> SF $290,000.00
<br /> lir $65,000.00
<br /> EXHAUST SYSTEMS 1 SF $65,00.00
<br /> D3050 TERMINAL&PACKAGE UNITS $185,000.00 SF $
<br /> IP ROOFTOP UNITS $185,000.00 1 1 EA $185,000.00
<br /> ilw $90,000.00
<br /> -D3060 CONTROLS&INSTRUMENTATION SF1110 $
<br /> qiir HVAC CONTROLS $90,000.00 1 EA $90,000.00
<br /> -D3070 SYSTEMS TESTING&BALANCING I$24,7000.00 SF $
<br /> ir
<br /> AIR SIDE TESTING&BALANCING-HEATING,COOLING&EXHAUST $20,200.00 LIF-----1+ EA $20,200.00
<br /> 1
<br /> IINI
<br /> HVAC COMMISSIONING $4,500.00 1Ls $4,500.00
<br /> iillF -040 FIRE PROTECTION $77,000.00 $
<br /> SF
<br /> itir
<br /> D4010 SPRINKLERS $77,000.00
<br /> SF $
<br /> liir
<br /> if' $77,000.00 1 17,039 $77,000.00
<br /> SPRINKLERS AND RELEASING DEVICES SF
<br /> ilp •D50 ELECTRICAL $1,015,700.00 SF $
<br /> 4
<br /> - ELECTRIC POWER AND LIGHTING $838,700.00 SF
<br /> 41111,
<br /> Report Date: pa,,t N;,
<br /> 4110,
<br /> Mr
<br />
|