Laserfiche WebLink
411, <br /> 41111, <br /> CONSTRUCTION DOCUMENT PERKINS+WILL <br /> 4 FOR <br /> SIB-GATEWAY PARK SUMMARY REPORT-ALL LEVELS <br /> SUNNY ISLES BEACH,FLORIDA Cost To Prime Only <br /> 41110 <br /> iIIIIP <br /> LEVEL DESCRIPTION TOTAL QUANTITY UNIT UNIT COST <br /> 1111, <br /> 3 LOOSE FURNITURE $329,700.00 1 LS <br /> 41111, <br /> - ADDITIONAL $268,300.00 <br /> AlW <br /> LS $ <br /> i�1 -4 KIOSK PLAN $77,300.00 <br /> SF <br /> ilillv <br /> -4A KIOSK CONSTRUCTION <br /> $67,800.00 SF $ <br /> 411, <br /> $8,500.00 <br /> C10 INTERIOR CONSTRUCTION SF $ <br /> Iii-r <br /> 1111, <br /> $15,500.00 SF $ <br /> C30 INTERIOR FINISHES <br /> lir $25,000.00 <br /> -D20 PLUMBING SF $ <br /> 41110 <br /> D2020 DOMESTIC WATER DISTRIBUTION $10,000.00 1 $10,000.00 <br /> 111. EA <br /> *0► D2030 SANITARY WASTE $15,000.00 1 EA $15,000.00 <br /> $5,000.00 1 <br /> D30 HVAC SF <br /> iiir -D50 ELECTRICAL $11,300.00 SF $ <br /> - ELECTRIC POWER AND LIGHTING $9,300.00 1 SF $ <br /> IOW $7,500.00 $7,500.00 <br /> - SERVICE AND DISTRIBUTION 1 SF <br /> FEEDERS $7,500.00 1 LS $7,500.00 IP <br /> iiir - LIGHTING AND BRANCH WIRING $1,800.00 1 SF $1,800.00 <br /> cir <br /> BRANCH WIRING $1,800.00 1 SF $1,800.00 <br /> 4111, <br /> LIGHTING INC SF $ <br /> 410 MOTOR AND EQUIPMENT CONN. INC _SF $ <br /> $2,000.00 <br /> - COMMUNICATIONS AND SECURITY SF $ <br /> lir <br /> ill TELECOMMUNICATIONS SYSTEM $1,500.00 1 SF $1,500.00 <br /> 410, <br /> FIRE ALARM SYSTEM $500.00 1 SF $500.00 <br /> far <br /> F20 SELECTIVE BUILDING DEMOLITION $2,500.00 SF $ <br /> stir $9,500.00 <br /> 4B KIOSK EQUIPMENT LS $ <br /> iiir <br /> -5 HALLWAY FINISH $3,500.00 SF $ <br /> STUCCO&PATCH CEILING $3,500.00 SF $ <br /> row Report Date: <br /> 11111, <br />