My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHIFFI <br /> /CONSTRUCTION•DEVELOPMENT <br /> • Ensure that all materials, tools, tool sheds, gang boxes and small equipment <br /> that can be damaged by rising water is removed from all excavations. <br /> • Ensure that the beams of all excavations are continuous and in good repair. <br /> • Secure essential barricades, with anchors, tie-downs or sand bags. <br /> • Lay flat on the ground any non-essential barricades. <br /> • Ensure that all equipment, including track cranes and excavators, scissor lifts, <br /> are relocated out of work area and set upon high ground. Lay crane booms on <br /> the ground if possible. <br /> • Top off fuel tanks on all equipment. <br /> • Ensure standby diesel powered dewatering equipment is ready to operate. <br /> Operate this equipment as conditions warrant. <br /> • Ensure that incomplete work is protected against the infiltration of sand and <br /> silt. <br /> ` O • Turn off the power and water to the office trailers. • <br /> • Ensure that critical project documents are put into fireproof files and that the <br /> safes are securely closed and locked. <br /> • <br /> • Disconnect all computers and office equipment from the electrical outlets. <br /> e. After the storm <br /> • <br /> 1) The contractor's/sub-contractor's call-in team: <br /> • Will evaluate the damage and initiate corrective action to ensure a safe <br /> site before employees are called back to work. <br /> • Move cautiously about the project,being on the alert for unsafe <br /> conditions left by the storm. <br /> • Survey the project for damage. <br /> 2) All personnel shall: <br /> • Stay tuned to local radio to find out when it is advisable to venture <br /> back out onto the public roadways. <br /> 1350 NE 5671 Street Suite 100 Fort Lauderdale,Florida 33334 • I t:(954)524 2575 I f:(954)524 2576 <br />
The URL can be used to link to this page
Your browser does not support the video tag.