Laserfiche WebLink
It, Appenalx t- cul I AbLt lacy or sunny isles tbeacn-uateway rarK <br /> Cost Schedule <br /> ALL NUMBERS MUST BE TYPED <br /> Code Description Quantity UoM Total <br /> CITY OF SUNNY ISLES BEACH-GATEWAY PARK <br /> b MAIN PROJECT <br /> Obi 1 BASE BID-CONSTRUCTION <br /> i' + 1A BUILDING CONSTRUCTION <br /> ADP A10 SUBSTRUCTURE I p $ =NM <br /> B20 EXTERIOR ENCLOSURE I I5F $ <br /> 111 11 <br /> C10 INTERIOR CONSTRUCTION I IyF $ =Man <br /> 41, C30 INTERIOR FINISHES I ISF $ kt•�'�L 1 I'11ll <br /> itilli D20 PLUMBING L ISF $ ■1:111Li11A111 . <br /> ®7 D30 HVAC I I;F $ alM/L111A'1I <br /> ill D40 FIRE PROTECTION I k $ r%w11111A11N. <br /> D50 ELECTRICAL I ISF $ 111 16n W1i 1=11 <br /> tits, El0 EQUIPMENT&FURNISHINGS I ISE $ L!.•11X111 I <br /> 47 F20 SELECTIVE BUILDING DEMOLITION I LSF $ ligralagalli <br /> 1B KITCHEN EQUIPMENT IIS $ IMAM. <br /> . <br /> ligr Total-Direct Cost $ L'nrola ra . <br /> Escalation and Prime mark up LS $ M1: 'ltcrnA1 <br /> it" Total-Construction Cost 5,5335,513ti.UU <br /> 41, <br /> tiP 2 AUDIO VISUAL <br /> Q2A AUDIO VISUAL INFRASTRUCTURE LS $1155'000'00 <br /> 28 AUDIO VISUAL EQUIPMENT LS $ 435,000.00 <br /> 3 LOOSE FURNITURE LS $(329,700.00 <br /> Total -Construction Cost with AV and Furniture $t5,455,2 3ti.00 <br /> ®, Total in words- Six Million Four Hundred Fifty Five Thousand Two Hundred Eighty Six Dollars <br /> ADDITIONAL COST ITEMS - <br /> iiillr 4 KIOSK PLAN SF $ <br /> 177,300.00 <br /> 5 HALLWAY FINISH I ISF $ 3,500.00 <br /> Vir 6 STORAGE ROOM SF $ 64,600.00 <br /> r. <br /> tit7 7 ENTRY MAT I ISF $ 3,800.00 <br /> jer 8 ADDITIONAL AV LS $ 5,000.00 <br /> R 9 ADDITIONAL CCTV SYSTEM I IEA $ 5,000.00 <br /> 10 REPLACE EXISTING GLASS DOOR WITH STOREFRONT I itA $ 1,600.00 <br /> 11 WASHER&DRYER I IEA $ 1500.00 <br /> ttir 12 ROOF WORK LS $ 81,000.00 <br /> id, 13 WINDOW FILM SF $ 1,500.00 <br /> i' 14 SECURITY TELESCOPING GLASS DOOR LS $ 14,000.00 <br /> Cir 15 ADDITIONAL HVAC TO EXISTING IT ROOM LS $ 4,500.00 <br /> Total -Additional Cost Itemsi$268,3UU.0U I <br /> itar Total -Construction Cost with Additional Items1$5,803,886.00 <br /> Qts <br /> iity Company Name: Nunez Construction, In .Q <br /> Name of Authorized si r: Carlo . un�Y <br /> Title: President <br /> Written Signature: • . -3 <br /> `�. 2019'Date: March ` - <br />