Laserfiche WebLink
tar <br /> iiir <br /> Cir <br /> CONSTRUCTION DOCUMENT <br /> Q FOR <br /> SIB-GATEWAY PARK <br /> SUNNY ISLES BEACH,FLORIDA <br /> ilsr <br /> oar <br /> LEVEL DESCRIPTION TOT114 QUANTITY UNIT UNIT COST <br /> iliF D2010 PLUMBING FIXTURES $37,450.00 (( EA $ <br /> iiito $59,000.00 <br /> $ <br /> tip <br /> iiir $45,000.00 1 $45,000.00 <br /> PIPES&FITTINGS EA <br /> • <br /> iiiII $5,000.00 <br /> VALVES&HYDRANTS 1 EA $5,000.00 <br /> Oti $5,000.00 $5,000.00 <br /> DOMESTIC WATER EQUIPMENT 1 EA <br /> tor <br /> INSULATION&IDENTIFICATION $4,000.00 <br /> 1 EA $4,000.00 <br /> 02030 SANITARY WASTE $84,000.00 ' EA $ <br /> $69,000.001 EA $69,000.00 <br /> WASTE PIPE&FITTINGS talI , <br /> $15,000.00 $15,000.00 <br /> lb' FLOOR DRAINS 1 EA <br /> ills -030 HVAC $654,700.00 SF $ <br /> $355,000.00 <br /> O -03040 DISTRIBUTION SYSTEMS SF $ <br /> 11. AIR DISTRIBUTION,HEATING&COOLING $290,000.00 1 SF $290,000.00 <br /> iil► $65,000.00 <br /> EXHAUST SYSTEMS 1 SF $65,00.00 <br /> O <br /> 40 -D3050 TERMINAL&PACKAGE UNITS $185,000.00 SF $ <br /> ® ROOFTOP UNITS $185,000.00 1 1EA <br /> $185,000.00 <br /> iiir <br /> -D3060 CONTROLS&INSTRUMENTATION $90,000.00 SF <br /> iiir $ <br /> if HVAC CONTROLS $90,000.00 1 EA $90,000.00 <br /> -03070 SYSTEMS TESTING&BALANCING 1$24,7000.00 SF $ <br /> ,v )i. AIR SIDE TESTING&BALANCING-HEATING,COOLING&EXHAUST $20,200.00 1I <br /> EA <br /> $20,200.00 <br /> jIMP HVAC COMMISSIONING $4,500.00 1 Ls $4,500.00 <br /> iliir -040 FIRE PROTECTION $77,000.00 SF $ <br /> tilbo ,- <br /> -D4010 SPRINKLERS $77,000.00 SF $ <br /> > . SPRINKLERS AND RELEASING DEVICES $77,000.00 1 17,039 SF $77,000.00 <br /> mar 050 ELECTRICAL $1,015,700.00 SF $ <br /> 1 • <br /> - ELECTRIC POWER AND UGHTING $838,700.00 SF <br /> OW <br /> Report Date: P,,;,mt. ;id <br />