|
tar
<br /> iiir
<br /> Cir
<br /> CONSTRUCTION DOCUMENT
<br /> Q FOR
<br /> SIB-GATEWAY PARK
<br /> SUNNY ISLES BEACH,FLORIDA
<br /> ilsr
<br /> oar
<br /> LEVEL DESCRIPTION TOT114 QUANTITY UNIT UNIT COST
<br /> iliF D2010 PLUMBING FIXTURES $37,450.00 (( EA $
<br /> iiito $59,000.00
<br /> $
<br /> tip
<br /> iiir $45,000.00 1 $45,000.00
<br /> PIPES&FITTINGS EA
<br /> •
<br /> iiiII $5,000.00
<br /> VALVES&HYDRANTS 1 EA $5,000.00
<br /> Oti $5,000.00 $5,000.00
<br /> DOMESTIC WATER EQUIPMENT 1 EA
<br /> tor
<br /> INSULATION&IDENTIFICATION $4,000.00
<br /> 1 EA $4,000.00
<br /> 02030 SANITARY WASTE $84,000.00 ' EA $
<br /> $69,000.001 EA $69,000.00
<br /> WASTE PIPE&FITTINGS talI ,
<br /> $15,000.00 $15,000.00
<br /> lb' FLOOR DRAINS 1 EA
<br /> ills -030 HVAC $654,700.00 SF $
<br /> $355,000.00
<br /> O -03040 DISTRIBUTION SYSTEMS SF $
<br /> 11. AIR DISTRIBUTION,HEATING&COOLING $290,000.00 1 SF $290,000.00
<br /> iil► $65,000.00
<br /> EXHAUST SYSTEMS 1 SF $65,00.00
<br /> O
<br /> 40 -D3050 TERMINAL&PACKAGE UNITS $185,000.00 SF $
<br /> ® ROOFTOP UNITS $185,000.00 1 1EA
<br /> $185,000.00
<br /> iiir
<br /> -D3060 CONTROLS&INSTRUMENTATION $90,000.00 SF
<br /> iiir $
<br /> if HVAC CONTROLS $90,000.00 1 EA $90,000.00
<br /> -03070 SYSTEMS TESTING&BALANCING 1$24,7000.00 SF $
<br /> ,v )i. AIR SIDE TESTING&BALANCING-HEATING,COOLING&EXHAUST $20,200.00 1I
<br /> EA
<br /> $20,200.00
<br /> jIMP HVAC COMMISSIONING $4,500.00 1 Ls $4,500.00
<br /> iliir -040 FIRE PROTECTION $77,000.00 SF $
<br /> tilbo ,-
<br /> -D4010 SPRINKLERS $77,000.00 SF $
<br /> > . SPRINKLERS AND RELEASING DEVICES $77,000.00 1 17,039 SF $77,000.00
<br /> mar 050 ELECTRICAL $1,015,700.00 SF $
<br /> 1 •
<br /> - ELECTRIC POWER AND UGHTING $838,700.00 SF
<br /> OW
<br /> Report Date: P,,;,mt. ;id
<br />
|