My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNNY/St6 <br /> 0 7c:7 <br /> `Of <br /> ➢).FIOP <br /> Q4. On majority of electrical lighting plans, we have not been able to find locations for lighting <br /> controls (Sensors, Switches, etc) Please provide locations for lighting controls. <br /> A4. BR+A RESPONSE:The information is on the Lutron Lighting control system (including <br /> device locations, types, riser diagram, etc) is shown on the following sheets. E00-02, E00`- <br /> 03,E00=06, E50-02, E50-03. <br /> Q5. Mechanical Plans: With reference to DWG M00-10 Mechanical Schedule— Location of EF- <br /> 2 and KEF- 1 are specified at Level 4 Garage Roof. How are you going to make the connections <br /> from Level 4 to level 1? <br /> A5. ESI RESPONSE: All Fans are no in the Level 2 Canopy roof, no longer on the 4th level garage. <br /> Q6.Section 12-48-13 on specifications shows entrance floor mats, where are they <br /> located? <br /> A6. PERKINS +WILL RESPONSE: Refer:to sheet A13-01 Finish floor plan.The entrance mat <br /> will be located adjacent to the lobby, in the exterior of the building.The existing tile shall be <br /> removed in the area shown in plan, and infilled with the entrance mat.The entrance matand <br /> the tile shall be flush.The existing tile shall be removed on module. Contractor shall provide a <br /> mock up for SIB and Architect to review and approve. <br /> Q7. Drawings#A50-01 section 1 - Front Elevation shows MT-2 voided. What do you it to replace <br /> with? <br /> 0 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.