My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yVYf NY iS(F <br /> 0 <br /> 0 <br /> yJ.FL00.‘ <br /> Q12.Tagging on the empire pricing proposal also does not match the tagging on the spec sheets <br /> or floorplan. Which do we go off of? <br /> Al2. Follow attached PDF. <br /> Q13.Quantities do not match from the spec sheets to the floorplan, which would you like us to <br /> go off of? <br /> A13. Followed attached PDF for quantitiesand location. <br /> Q14.Do you have any more details on the workstation since we don't have the CAD. All we have <br /> is the picture ( not very detailed) and generic description of 66" x 66".( panel heights, storage, <br /> laminate vs veneer, fabric panel, power requirements etc) <br /> A14. We included in the BID all the information we had. <br /> Q15.Submission details. In the meetingthey said 6 hard copies and an electronic (USB) <br /> submission. Usually when a portal is used we submit it online but don't see where on the <br /> Demandstar website, please advise. <br /> A15. All bids must be submitted sealed in person to the City Clerk, no online submission will be <br /> accepted. <br /> Q16. As we are unable to sell Kimball or Geiger we would like approval to specify Knoll/other <br /> manufacturers whose product is comparable in quality and price. <br /> A16. All substitutions pending a City of Sunny Isles beach team and architect approval. <br /> • Only state of Florida Contract, US Communities.or similar contracts'that allow the <br /> City of Sunny Isles Beach to purchase items at a discounted price shall be included. <br /> ® All substitutions should match the furniture design intent of the project; such as: <br /> warrantees, style, size, finish, comfort etc. <br /> 017. Please clarify if any type of prevailing wages will be required in this project. <br /> A17. The awarded Bidder shall comply with all minimum wage and living wage requirements, <br /> such as Living 'Wagerequirements, minimum wages based on .Federal Law, minimum wages <br /> based on the Davis-Bacon.Act, and the provisions of any other-wages laws, as may be applicable <br /> to this Contract. <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.