5.5.3 If required training, manuals and equipment materials have not been provided, <br /> the Owner will hold $5,000.00 plus 300% as stated in Section 5.5.1. <br /> 5.6 Completion and Final Payment <br /> 5.6.1 When all of the Work is finally complete and the Contractor is ready for a final <br /> inspection, it shall notify the City and the Engineer/Architect thereof in writing. Thereupon, <br /> the Engineer/Architect will make final inspection of the Work and, if the Work is complete in <br /> full accordance with this,Contract and this Contract has been fully performed, the Engineer/ <br /> Architect will promptly issue a final Certificate for Payment certifying to the City that the <br /> Project is complete and the Contractor is entitled to the remainder of the unpaid Contract <br /> Price, less any amount withheld pursuant to this Contract. If the Engineer/Architect is unable <br /> to issue its final Certificate for Payment and is required to repeat its final inspection of the <br /> Work, the Contractor shall bear the cost of such repeat final inspection(s)which cost may be <br /> deducted by the City from the Contractor's final payment. <br /> 5.6.1.1 If the Contractor fails to achieve Final Completion within the time set forth in <br /> Paragraph 3.1.1 hereinabove, .the Contractor shall pay the City the sum the amount of <br /> liquidated damages set forth in paragraph 3.1.2. per day for each and every calendar day of <br /> unexcused delay in achieving final completion beyond the date set forth herein for final • <br /> completion of the Work. Any sums due and payable hereunder by the Contractor shall be <br /> payable, not as a penalty, but as liquidated damages representing an estimate of delay <br /> damages likely to be sustained by the City, estimated at or before the time of executing this <br /> Contract. When the City reasonably believes that final completion will be inexcusably <br /> delayed, the City shall be entitled, but not required, to withhold from any amounts otherwise <br /> due the Contractor an amount then believed by the City to be adequate to recover liquidated <br /> damages applicable to such delays. <br /> 5.6.2 As a condition precedent to final payment to the Contractor, the Contractor shall <br /> deliver to the City the following documents in a form acceptable to the City: a final receipt and <br /> release of the City; the Contractor's affidavit that all payrolls, invoices for materials and <br /> equipment, and other liabilities connected with the Work for which the City, or the City's <br /> property might be responsible, have been fully paid or otherwise satisfied; releases and <br /> waivers of lien from all Subcontractors of the Contractor and of any and all other parties <br /> required by the Engineer / Architect or the City; consent of surety to final payment; a duly <br /> executed assignment of any and all warranties required by the Contract Documents; any and <br /> all operating manuals required by the Contract Documents; certification that all personal <br /> instruction or training required by the Contract Documents for the operation of any Project <br /> systems has been completed; any and all manuals relating to Project materials or Project <br /> maintenance; executed change orders relating to any and all changes in the Work; and all as- <br /> built drawings required by the Contract Documents. If any third party fails or refuses to <br /> provide a release of claim or waiver of lien as required by the City, the Contractor shall furnish <br /> a bond satisfactory to the City to discharge any such lien or indemnify the City from liability. <br /> 5.6.3 As a further condition precedent to final payment, the Contractor shall furnish to <br /> the City a complete and comprehensive set of as-built drawings; said as-built drawings are to <br /> be submitted in hard copy and in electronic format, and the City and the Contractor agree and <br /> acknowledge that the Contract Price includes all cost and expense associated with the <br /> production of said as-built drawings. <br /> 11 <br />