My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2952
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 3:31:46 PM
Creation date
6/25/2019 12:36:01 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2952
Date (mm/dd/yyyy)
06/20/2019
Description
Awd ITB 19-01-01 to Nunez Construction for Gateway Park Center Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE IVCONTRACT PRICE <br /> 4.1 The Contract Price <br /> 4.1.1 The City shall pay, and the Contractor shall accept, as full and complete <br /> payment for all of the Work required herein, the fixed sum of Six Million Seven Hundred <br /> Twenty-Three Thousand Five Hundred Eighty-Six Dollars ($6,723,586.00). The sum set <br /> forth in this Paragraph 4.1.1 shall constitute the Contract Price which shall not be modified <br /> except by Change Order provided in this Contract. <br /> a ge as <br /> 4.2 Unit Prices <br /> 4.2.1 In the event all, or any portion of, the Contract Price is to be determined by the <br /> application of unitprices, the followingterms and conditions area applicable and controlling: <br /> pp Pp 9 <br /> (a) The number of units contained in the schedule of prices bid is an <br /> estimate only, and it is expressly acknowledged and agreed that <br /> p Y 9 9 <br /> payment to the Contractor shall be determined by the actual number of <br /> units incorporated in, or made necessary, by the Work; <br /> (b) Payment to the Contractor shall be made at the Contract Unit Prices <br /> applicable to each integral part of the Contract. The Contract Unit Prices <br /> shall be full compensation for ail costs associated with completion of all <br /> unit price work in full conformity with the requirements of the Contract <br /> Documents; <br /> (c) Where the quantity of Work with respect to any item that is covered by a <br /> Contract Unit Price is increased or decreased by more than twenty <br /> percent (20%) from the quantity of such Work indicated or estimated in <br /> the Contract Documents, an appropriate Change Order shall be issued <br /> to adjust the Contract Unit Price, if warranted and justified, and if fully <br /> supported by documentation submitted to the City and the Engineer / <br /> Architect and if a timely claim is made for same in accordance with the <br /> terms and provisions of this Contract. <br /> ARTICLE V <br /> PAYMENT OF THE CONTRACT PRICE <br /> 5.1 Schedule of Values <br /> 5.1.1 Within ten (10) calendar days of the effective date hereof, the Contractor shall <br /> submit to the City and to the Engineer/Architect a Schedule of Values allocating the Contract <br /> Price to the various portions of the Work. The Contractor's Schedule of Values shall be <br /> prepared in such form, with such detail, and supported by such data as the Engineer / <br /> Architect or the City may require to substantiate its accuracy. The Contractor shall not <br /> imbalance its Schedule of Values nor artificially inflate any element thereof. Any violation of <br /> this provision by the Contractor shall constitute a material breach of this Contract. The <br /> Schedule of Values shall be used only as a basis for the Contractor's Applications for <br /> Payment and shall only constitute such basis after it has been acknowledged in writing by the <br /> Engineer /Architect and the City. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.