Laserfiche WebLink
24.2 Any changes to the terms of the Contract Documents must be contained in a written <br />document, executed by the parties hereto, with the same formality and of equal dignity prior to <br />the initiation of any Work reflecting such change. This Article shall not prohibit the issuance of <br />Change Orders executed only by the City as hereinafter provided. <br />24.3 Contractor shall increase or decrease the value of the Performance and Payment Bonds <br />to reflect the Contract Amount, as it may be revised. <br />ARTICLE 25. OSHA COMPLIANCE AND SAFETY PRECAUTIONS <br />25.1 The Contractor warrants that it will comply with all safety precautions as required by <br />federal, state or local laws, rules, regulations and ordinances <br />25.2 Contractor warrants that it will adhere to the applicable environmental protection <br />guidelines for the duration of the Project. If hazardous waste materials are used, detected or <br />generated at any time, the City must be immediately notified of each and every occurrence. The <br />Contractor shall comply with all codes, ordinances, rules, orders and other legal requirements <br />of public authorities (including, without limitation, OSHA, EPA, DERM, the City of Sunny <br />Isles Beach, Miami -Dade County, State of Florida, and Florida Building Code) which bear on <br />the performance of the Work. <br />25.3 If an emergency condition should develop during the Project, the Contractor must <br />immediately notify the City of each and every occurrence. The Contractor should also <br />recommend any appropriate course(s) of action to the City. <br />ARTICLE 26. PRIORITY OF PROVISIONS <br />26.1 If there is a conflict or inconsistency between any term, statement requirement, or <br />provision of any Exhibit or Attachment hereto, any document or events referred to herein, or any <br />document incorporated into this Agreement by reference and a term, statement, requirement, the <br />specifications and plans, or provision of this Agreement the following order of precedence shall <br />apply: <br />26.2 In the event of conflicts in the Contract Documents the priorities stated below shall <br />govern. <br />• Revisions to the Contract. Documents shall govern over the Contract <br />Documents <br />• No section of the Scope of Work, specifications or plans shall govern over the <br />Contract Terms and Conditions <br />• Scope of Work and Specifications shall govern over plans and drawings <br />26.3 In the event of conflicts with the plans the priorities stated below shall govern: <br />• Schedules, when identified as such shall govern over all other portions of the <br />plans <br />• Specific notes shall govern over all other notes, and all other portions of <br />the plans, unless specifically stated otherwise <br />• Larger scale drawings shall govern over smaller scale drawings <br />• Figured or numerical dimensions shall govern over dimensions obtained <br />16 <br />