My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
envirowaste services group inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
Responses
>
envirowaste services group inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:25:05 PM
Creation date
9/16/2019 4:23:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIR* <br />WASTE SERVICES GROUP <br />September 10, 2019 <br />ITB 19-08-01 <br />Stormwater Management System Preventative Maintenance <br />City of Sunny Isles Beach <br />18070 Collins Ave, <br />Sunny Isles Beach, FI. 33160 <br />Staffing <br />EnviroWaste Services Group, Inc has had its core group of managers since 2001 and <br />has remained unchanged. This is due to them all being owners within the company. <br />While EnviroWaste Services Group, Inc has over 175 employees, the City will deal only <br />with a few directly. Our personnel are well qualified and experienced to gather and <br />provide the correct information to maintain your roadways safe for the motoring public. <br />After the notice to proceed is issued, EnviroWaste Services Group will issue their own <br />internal project number. This is done by the accounting department, so that when the <br />job is finished, accounting knows what needs to be billed for a timely closeout. <br />The job is then scoped out by the project manager, in this case Mike Garcia. During the <br />field survey, the drains are inspected to verify sediment levels and conditions. Also at <br />this same time we identify which areas will need dewatering and where plugs and <br />pumps will be placed. Once it is known what needs to be done, the work is scheduled, <br />typically within two to three days, although many emergencies are started the same <br />day. <br />The work is typically assigned to the same crews so as to build a relationship between <br />the field personnel and the city. This avoids the city getting a new person every day, <br />and it helps in continuity and quickens the work. EnviroWaste Services Group has many <br />trained Vactor operators and CCTV operators. All of them have direct experience <br />working for municipalities. All of our CCTV operators are trained in NASSCO PACP. <br />During the cleaning and inspection operations, Mike Garcia is in contact with city <br />personnel informing them of the status of the progress. <br />After the work has been completed the videos are processed and quality assured and <br />quality controlled at the corporate office in Miami. The videos are reviewed and <br />recommendations are then made. The quality control is done by our own in house <br />PACP trainer, Leyma Cuesta. <br />Final submittal to the city will be made by Mike Garcia, at which point he will review the <br />findings with the city staff. <br />Headquarters: 18001 Old Cutler Road, #554, Miami, FL 33157 (877) 637-9665 * F (877) 637-9659 <br />Offices: Miami, FL Orlando, FL * Tampa, FL <br />wrvw.EWSG.com * email: info@ewsg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.