My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
envirowaste services group inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
Responses
>
envirowaste services group inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:25:05 PM
Creation date
9/16/2019 4:23:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citp of Ifliam:i <br />_ Daniel J. Alfonso <br />rf�CCity Manager <br />To Whom It May Concern <br />Subject: Reference Letter for Horizontal Project <br />The Following Section to be Completed by the Bidder. <br />Name of Bidder. EnviroWaste Services Group, Inc. <br />The above referenced Bidder is responding to a Bid that has been issued by the City of Miami. The City <br />requires that the Bidder provide written references with their Bid submission. By providing you with this <br />document, the Bidder is requesting that you provide the following reference information. The City would <br />appreciate you providing the information requested below, as well as any other information you feel is <br />pertinent: <br />Name of Referenced Project: IFB 2015.10.07 Routine & Emergency Sewer Repairs and Inspection <br />I The Following Section to be Completed by the Project Owner. <br />Scope of Referenced Work: Inflow and infiltration abatement project (Sity wide) <br />Did the Scope involve the construction, installation, repair and/or replacement of a stormwater pump <br />station? ❑ Yes [Rk No <br />Value of Project: $ Approx. $1.2million Date Completed: 0n -going <br />Percentage of physical construction work self -performed by Bidder. 90 % <br />Was project completed on time and within budget P9 Yes ❑ No <br />If no, was the Bidder at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No <br />If yes, please provide details: <br />Comments: Satisfied with Envirowaste performance on Inflow and Infiltration program <br />and other sanitary and drainage projects. <br />Name of Project Owner: Cites_ of ,,Canal GW AA _ e: 04/28/2017 <br />Signature of Project Owner's Representative: <br />Title: Utilities Director <br />Telephone: (305) 450-5000 E-mail: i acev edo2@coral gables. com <br />Sincerely, <br />Annie Perez, CPPD, Director <br />Department of Procurement <br />120 <br />Job Order Contracting (JOC) for Horizontal <br />and Vertical Construction Services <br />ITB No.: 15-16-033 <br />
The URL can be used to link to this page
Your browser does not support the video tag.