My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-02) Janitorial Maintenance Services
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 11:15:01 AM
Creation date
9/30/2019 11:14:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Q6. What is the average monthly amount of non-performance penalties imposed on <br /> current contract? If applicable. <br /> A6. No penalties fees have been applied thus far. <br /> Q7. For vendors headquartered outside the state of Florida, could notarization of forms <br /> be done by a duly authorized notary public in vendor’s headquarters state? <br /> A7. Yes <br /> Q8. Toilet paper usage? <br />A8. Average 6 cases per month (each case holds 96 rolls). <br /> Q9. Shower in the Public works/Lifeguard office needs to indicate when and how it is <br /> to be cleaned. <br /> A9. Cleaned daily, disinfect fixtures, walls, and floors. <br /> Q10. It was discussed to add a line item for quarterly wax of floors. <br />A10. Vendors can propose a suggestion for waxing floors quarterly, on a separate line <br />item- not included with the original pricing sheet bid total. <br /> <br />Q11. What was the value of the existing contract? <br />Please refer to question #1. <br />Q12. Will a break out of square footage for flooring types be available for each location: 18070 <br />Collins Ave, 19160 Collins Avenue, and Pelican Community Park <br />a. Carpet/Tile/VCT/Concrete/Rubber Mats <br />Please refer to question #5 <br />Q13. How many elevators are there in each building? <br />A13. City Hall – 3, Pelican Community Park – 1, Public Works Trailer - 0 <br />Q14. How many windows are there and what are their dimensions? <br />A14. Exterior Windows are not part of the scope <br />Q15. How many fixtures are in the bathrooms by building or is the square footage for the <br />bathrooms available? <br />Toilets/urinals/sinks/showers/locker rooms <br /> A15. City Hall – 1st floor – 14 toilets, 3 urinals, 10 sinks, 1 shower <br /> 2nd floor – 10 toilets, 1 urinal, 13 sinks, 2 showers <br /> 3rd floor – 5 toilets, 1 urinal, 6 sinks, 0 showers <br /> 4th floor – 6 toilets, 1 urinal, 7 sinks, 1 shower
The URL can be used to link to this page
Your browser does not support the video tag.