Laserfiche WebLink
MIAMI BEACH HOLOCAUST MEMORIAL SEAWALL͕MIAMI <br />POSEIDON DREDGE & MARINE, INC. <br />Project Name <br />Project Owner <br />Project Type <br />Project Cost <br />Project Conclusion <br />Project Details <br />17-003 Miami Beach Holocaust Memorial Seawall <br />City of Miami Beach <br />Seawall replacement for CMB 19th St Pump Station - Holocaust Memorial Park <br />$935,000.00 <br />Completed September 2018 <br />Replacement of a dilapidated seawall to protect the pump station and Holocaust <br />Memorial Park. Fast track project consisting of 545 feet of concrete seawall panels, <br />concrete seawall cap, new king piles and batter piles and 265 tons of Rip-Rap rock. <br />Engineer Parsons Brinkerhoff <br />975 N America Way <br />Miami, FL 33132 <br />305-329-4146 <br />30 <br />Poseidon Dredge & Marine Inc. <br />RFP# 19-10-01