My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Poseidon Dredge & Marine
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-10-01 Bella Vista Park Dock Reconstruct
>
Responses
>
Poseidon Dredge & Marine
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2019 10:17:32 AM
Creation date
11/7/2019 10:16:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BERMUDA CAY CONDOS, BOYNTON BEACH <br />POSEIDON DREDGE & MARINE, INC. <br />Project Name 17-001 Bermuda Cay Seawall <br />Project Owner Bermuda Cay Condo Association <br />Project Type New seawall and pool support <br />Project Cost $701,027.00 <br />Project Conclusion Completed July 2018 <br />Project Details Installed new concrete seawall, consisting of concrete batter, sheet and king piles. <br />Removed the existing outdated drainage and installed new drainage. <br />Engineer Tetra Tech <br />David Frodsham <br />759 S Federal Highway, Suite 314 <br />Stuart, FL 34994 <br />772-781-3400 <br />32 <br />Poseidon Dredge & Marine Inc. <br />RFP# 19-10-01
The URL can be used to link to this page
Your browser does not support the video tag.