My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Concrete Development
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-10-01 Bella Vista Park Dock Reconstruct
>
Responses
>
G. Concrete Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2019 10:35:34 AM
Creation date
11/7/2019 10:35:31 AM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 so""'''Jt. <br /> • <br /> 305.947.0606 - \�� <br /> v✓vrsibll.net <br /> w. � n <br /> . v+ <br /> •Pl. S <br /> O <br /> CIS Or SUN l'a <br /> degree of analysis is dependent on the facts surrounding the particular procurement situation, but,as:a'r.'rt, }'': <br /> starting point, the non-Federal entity must make independent estimates before receiving bids or <br /> proposals. <br /> (b) The non-Federal entity must negotiate profit as a separate element of the price for each contract in <br /> which there is no price competition and in all cases where cost analysis is performed. To establish a fair <br /> and reasonable profit, consideration must be given to the complexity of the work to be performed, the <br /> risk borne by the contractor,the contractor's investment,the amount of subcontracting,the quality of its <br /> record of past performance, and industry profit rates in the surrounding geographical area for similar <br /> work. <br /> (c) Costs or prices based on estimated costs for contracts under the Federal award are allowable only to <br /> the extent that costs incurred or cost estimates included in negotiated prices would be allowable for the <br /> non-Federal entityunder <br /> Subpart E—Cost Principles of this part.The non-Federal entity may reference its <br /> own cost principles that comply with the Federal cost principles. <br /> (d) The cost plus a percentage of cost and percentage of construction cost methods of contracting must <br /> not be used. <br /> §200.324 Federal awarding agency or pass-through entityreview. <br /> (a) The non-Federal entity must make available, upon request of the Federal awarding agency or pass- <br /> through entity,technical specifications on proposed procurements where the Federal awarding agency or <br /> pass-through entity believes such review is needed to ensure that the item or service specified is the one <br /> being proposed for acquisition. This review generally will take place prior to the time the specification is <br /> incorporated into a solicitation document. However, if the non-Federal entity desires to have the review <br /> accomplished after a solicitation has been developed,the Federal awarding agency or pass-through entity <br /> may still review the specifications, with such review usually limited to the technical aspects of the <br /> proposed purchase. <br /> (b) The non-Federal entity must make available upon request, for the Federal awarding agency or pass- <br /> through entity pre-procurement review, procurement documents, such as requests for proposals or <br /> invitations for bids, or independent cost estimates,when: <br /> (1)The non-Federal entity's procurement procedures or operation fails to comply with the procurement <br /> standards in this part; <br /> (2) The procurement is expected to exceed the Simplified Acquisition Threshold and is to be awarded <br /> without competition or only one bid or offer is received in response to a solicitation; <br /> (3)The procurement,which is expected to exceed the Simplified Acquisition Threshold,specifies a "brand <br /> name" product; <br /> (4)The proposed contract is more than the Simplified Acquisition Threshold and is to be awarded to other <br /> than the apparent low bidder under a sealed bid procurement; or <br /> (5) A proposed contract modification changes the scope of a contract or increases the contract amount <br /> by more than the Simplified Acquisition Threshold. <br /> City of Sunny Isles Beach I RFP Bella Vista Park Dock Reconstruction 19-07-01 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.