My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 19-11-01 Prof Eng and Arch Srvcs Ped Bridge REVISED
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
RFQ 19-11-01 Prof Eng and Arch Srvcs Ped Bridge REVISED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:04:53 PM
Creation date
1/14/2020 3:04:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 20 <br /> <br />Section 4 <br />Evaluation Process <br /> <br />4.1 INSTRUCTIONS TO RESPONDENTS <br /> <br />Each submission will be reviewed to determine if the qualifications are responsive to the <br />outlined requirements in the solicitation. A responsive submission is one which follows the <br />requirements of this solicitation that includes all documentation, is submitted in the format <br />outlined in this solicitation, is of timely submission, and has the appropriate signatures as <br />required on each document. Failure to comply with these requirements may result in the <br />submission being deemed non-responsive. <br /> <br />4.2 TECHNICAL QUALIFICATIONS <br /> <br />Submissions shall include the following: <br /> <br />1. Firm’s relevant experience, qualifications and past performance with Government <br />and similar type projects. <br />2. Relevant experience and qualifications of key personnel. Experience and familiarity <br />with scope of service. <br />3. Firm’s approach methodology to providing the services requested in this <br />solicitation, such as the bridges performance evaluation assessment forms and <br />recommendations of the latest technologies for monitoring systems available. <br /> <br /> 4.2.1 MINIMUM REQUIREMENTS <br /> <br />In order to be considered responsive, Firms shall, at a minimum, demonstrate <br />compliance with the following Pre-Qualification Criteria in their Submission. All <br />requested documentation and/or information should be provided in the submission <br />to confirm that the firm has satisfied the Prequalification Criteria in order to be <br />properly evaluated as listed herein. Firms failing to meet these requirements shall <br />be deemed non responsive. The Firm shall, at the time of submittal, time of award, <br />and throughout the duration of the Contract, continue to meet the following <br />Pre-qualification Criteria requirements as stated in the Solicitation Documents. <br /> <br />• Firms must have, as a prime project manager, a minimum of 10 years of <br />experience in projects of similar size and scope. <br /> <br />4.3 EVALUATION, NEGOTIATION AND AWARD <br /> <br />Each proposal will be reviewed to determine if the proposal is responsive to the submission <br />requirements outlined in this RFQ. A responsive proposal is one which follows the <br />requirements of this solicitation and includes all documentation, is submitted in the format <br />outlined in this solicitation, is of timely submission, and has the appropriate signatures as <br />required on each document. Failure to comply with these requirements may result in the <br />proposal being deemed non-responsive.
The URL can be used to link to this page
Your browser does not support the video tag.