My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix...
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix...
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:08:51 PM
Creation date
1/14/2020 3:08:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />•Run-off-the-road crash –Departed from the travel-way to the <br />outside <br />•Pedestrian Crash (Ped/Bike Crash) –includes bicycles <br />•Countermeasures –improvements anticipated to reduce the <br />occurrence of crashes <br />•Ped Walk Intervals –includes walk and “flash don’t walk” times <br />•Don’t Walk Indication –Solid “Don’t Walk” only <br />•Historical Crashes –Crashes reported during the 5 years of crash <br />data. Does not include subject fatal crashes. <br />•Clear zone –Area to remain free of hazards (1.5 feet for Collins) <br />Definitions
The URL can be used to link to this page
Your browser does not support the video tag.