My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix...
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix...
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:08:51 PM
Creation date
1/14/2020 3:08:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 <br />•Pedestrian crash at signalized mid-block crossing <br />•Crossed during “don’t walk” indication <br />•No historical ped/bike crash <br />•Ped walk intervals were evaluated –determined to be sufficient <br />•Recommended field review –evaluate condition of equipment <br />Collins Ave north of 175th Terr
The URL can be used to link to this page
Your browser does not support the video tag.