My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINLEY
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
FINLEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:14:48 PM
Creation date
1/14/2020 3:12:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. - CCNA. <br />City of Sunny Isles Beach <br />|74 <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete on Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />10 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />WATERSOUND FOOTBRIDGE OVER US 98 (WATERSOUND, FL) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> 2018 N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />The St Joe Company Bridget Precise (850) 231-6480 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />FINLEY Engineering Group, Inc. Tallahassee, FL Lead Bridge Designer <br />The WaterSound Footbridge will be a 262’ pedestrian bridge spanning US 98 in WaterSound, Florida connecting the new development to WaterSound <br />Parkway and ultimately the beach on the Gulf Coast. The bridge will be 16’ wide and allow for both cyclists and pedestrians to use the bridge. To increase <br />safety, pedestrians an cyclists will each have dedicated lanes separated by a raised barrier. Due to the height of the bridge, a ramp system is included to <br />allow for pedestrian, cyclists, and ADA access. The bridge was modeled and analyzed to meet the criteria of The St Joe Company and meet the FDOT <br />Design Guidelines for pedestrian bridges. Included in the report that FINLEY prepared are visualizations and concept drawings of the bridge as well as <br />conceptual cost estimates and construction schedules. The cost estimates were calculated on a unit based price model. The report concluded with a <br />comparison chart based on criteria’s that are of importance to a bridge of this scale and location. <br />Relevance: The steel girder bridge was selected as the preferred options since it allows for a signature style bridge without exceeding the budget <br />due to the monumental towers at the ends of the bridge. The steel box allows for ease of construction while still creating a beautiful structure. <br />E
The URL can be used to link to this page
Your browser does not support the video tag.