Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATES PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />02 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City of Sunny Isles Beach, Government Center Annex / Sunny Isles <br />Beach, Florida 20XX Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME b. POINT OF CONTACT TELEPHONE NUMBER <br />City of Sunny Isles Beach Christopher J. Russo 305.792.1731 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Annex Project, located immediately to the north, extends the Civic Plaza <br />and develops a mixed-use program including Educational, Office, Community <br />Auditorium, Retail and Civic Expansion spaces with structured parking in both <br />below-grade and above grade locations. The linear site runsbetween Atlantic <br />Avenue and Collins Avenue placing the Educational uses toward the West relating <br />to the existing School and the Office and Civic uses toward Collins Avenue on the <br />East. The open courtyard school for 600 students, is a low-rise structure affording <br />natural light along all circulation edges of the classrooms. <br />The Office and Civic Tower floats above the Collins Avenue-facing Plaza and with <br />a glass curtainwall and aluminum sunscreen skin recognizing both the oceanfront <br />views and mitigating the solar impact. The façade materials relate back to the <br />existing Government Center and include architectural precast concrete, stone <br />veneer panels, aluminum sunscreens and a finely-detailed curtainwall skin. When <br />completed, the project will create a unified Civic vision for the City. <br />Scope: New Construction <br />Size: 113,000 square feet <br />Construction Cost: $60 million <br />Completion Date: Ongoing <br />Project Responsibilities and Role: <br />Architecture, Interior Design, Landscape <br />Architecture <br />Key Personnel: Lawrence Kline, Jose Bofill, <br />Pat Bosch <br />Owner Point of Contact: <br />Christopher J. Russo, City Manager <br />City of Sunny Isles Beach <br />t. 305.792.1731 <br />f. 305.792.1563 <br />e. crusso@sibfl.com <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />Perkins and Will Coral Gables, Florida Architectecture, Interior Design <br />b.Thornton Tomasetti Ft. Lauderdale, Florida Structural Engineering <br />c.Kimley Horn Palm Beach, Florida Site/Civil Engineering