My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONSFOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) <br />CLEARWATER MEMORIAL CAUSEWAY BRIDGE - Clearwater, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />a.PROJECT OWNER <br />Florida DOT <br />23.PROJECT OWNER'S INFORMATION <br />b. POINT OF CONTACT NAME <br />Bill Horne <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(727 ) 562-4040 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) <br />The bridge is approximately 2,400' long over Clearwater Bay with a main span of 360' and an overall width of 112'. The <br />bridge consists of concrete tapered box girders and tapered architecturally enhanced piers carrying two traffic lanes of traffic <br />in each direction and sidewalk on each side. <br />Cost: $ 48.5M <br />Completed: 2005 <br />Specific Role: Bridge Designer/ Architect <br />Professional Services: Conceptual and <br />Preliminary Design <br />Relevance: This bridge project includes enhanced <br />pedestrian and bicycle facilities as part of an <br />aesthetic/attractive bridge structure that <br />complements the context and enhances the views of <br />the area. It also incorporates landscape elements to <br />further enhance the bridge crossing. <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1)FIRM NAME <br />Rosales + Partners, Inc. <br />(2)FIRM LOCATION (City and State) <br />Boston, MA <br />(3) ROLE <br />Bridge Designer / Architect <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION {City and State)(3) ROLE <br />d. <br />(1) FIRMNAME (2)FIRM LOCATION (City and State)(3) ROLE <br />e . <br />(1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />4
The URL can be used to link to this page
Your browser does not support the video tag.