My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EAC Consulting, Inc. <br />eacconsult.com <br />City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. <br />Manny G Vera & Associates, Inc. <br />A. Client Name, Address, Contact, Phone <br />and Fax Numbers and valid e-mail address; <br />B. Project Title C. Description of work performed, <br />including the project location <br />D. Year <br />completed <br />E. Past 5 years copies of <br />executed agreements made <br />between your firm and local <br />municipalities, with a scope <br />similar to this RFQ. <br />O’Leary Richards Design Associates, Inc. <br />8525 SW 92 Street Ste C11 <br />Miami, Fl 33156 <br />Kathryn O’Leary Richards <br />305-596-6628 <br />kathy@olearyrichards.com <br />The City of Sunny Isles (RFQ <br />16-06-02) <br />NW 174 Street Pedestrian <br />Bridge Topographic Survey <br />MGV was responsible for providing <br />a Design Survey consisting of <br />the following deliverables: the <br />establishment of horizontal (NAD <br />83/90) control as needed, and <br />the creation of Topographic at the <br />intersection of US-1 and 174th <br />Street. All trees were located and <br />identified with common names. <br />2017 N/A <br />Kimley Horn & Assoc, Inc. <br />1221 Brickell Ave, Ste 400 <br />Coral Gables, FL 33131 <br />George Puig, PE <br />305-673-2025 <br />george.puig@kimley-horn.com <br />FDOT District 6, Pedestrian <br />Bridge over Adams Cut in <br />Key Largo, FL <br />MGV was to prepare a complete <br />Design survey which included the <br />establishment of horizontal (NAD <br />83/90) and vertical control (NAVD <br />88) networks, survey baseline and <br />right of way, and the creation of <br />Topographic surveys and Digital <br />Terrain Model (DTM/3D). <br />2013 N/A <br />MCM Corporation <br />6201 SW 70th Street, 2nd Fl <br />Miami, FL 33143 <br />Eduardo Martinez <br />305-541-0000 <br />emartinez@mcm-us.com <br />Port of Miami Terminal F <br />MGV provided the following <br />survey services, including: existing <br />condition survey; foundation <br />survey; existing pile survey; new <br />pile layouts and new pile as-builts <br />for 267 auger cast piles; identify <br />existing control points, reference <br />elevation and property line corner <br />stakes; establish control points for <br />building; establish and maintain <br />a minimum of 2 benchmarks; <br />verifying contractor’s elevations of <br />decks (including 3 mobilizations); <br />provide final certificates of <br />elevation; final parcel survey; <br />as-built survey of the building; as- <br />built of boundary and topographic <br />survey; setting grid lines and <br />building corners; drainage survey; <br />and additional elevations on <br />existing pedestrian bridge. <br />2018 N/A
The URL can be used to link to this page
Your browser does not support the video tag.