My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EAC Consulting, Inc. <br />eacconsult.com <br />City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. <br />Janus Research <br />A. Client Name, Address, Contact, <br />Phone and Fax Numbers and valid <br />e-mail address; <br />B. Project Title C. Description of work performed, <br />including the project location <br />D. Year <br />completed <br />E. Past 5 years copies of <br />executed agreements made <br />between your firm and local <br />municipalities, with a scope <br />similar to this RFQ. <br />Client: FDOT D6 <br />1000 NW 111th Ave, <br />Miami, FL 33172 <br />Contact: Barbara Culhane <br />(305) 470-5179 <br />Section 106 Evaluation and <br />Determination of Effects <br />Case Study Report of <br />Venetian Causeway from <br />North Bayshore Drive in <br />the City of Miami to Purdy <br />Avenue in the City of Miami <br />Beach <br />This project consists of an effects <br />evaluation in relation to the significant <br />historic resources, including the bridges <br />and causeway. The 2019 CRAS resulted <br />in the identification of three significant <br />resources: Collins Canal (8DA11375), <br />Terrace Towers (8DA11754), and the <br />Venetian Islands Resource Group <br />(8DA14395). This report was prepared <br />as part of a project studying several <br />alternatives for the rehabilitation or <br />replacement of the twelve historic <br />Venetian Causeway bridges, which are <br />all contributing to the Venetian Islands <br />Resource Group (8DA14395). <br />Ongoing N/A <br />Client: Kisinger Campo & Associates, <br />201 North Franklin Street <br />Suite 400, Tampa, Florida 33602 <br />Contact: Jason LaBarbera <br />(813) 871-5331 <br />Duck Key Bridges Study, <br />Monroe County <br />This project consists of a historical <br />documentation, as the MOA stipulated <br />the documentation of four significant <br />bridges. The project included large- <br />format photography, the reproduction of <br />historic drawings using archival-quality <br />supplies, and the production of a final <br />report documenting the work. <br />Ongoing N/A <br />Client: FDOT D6 <br />1000 NW 111th Ave <br />Miami, FL 33172 <br />Contact: Barbara Culhane <br />(305) 470-5179 <br />Project Development <br />and Environment Study <br />Re-Evaluations Interstate <br />395 from the I-95/Midtown <br />Interchange ramps to <br />MacArthur Causeway West <br />Channel Bridges at Biscayne <br />Bay, Miami FL <br />The Cultural Resources Assessment <br />Survey was prepared as part of the <br />re-evaluation process. Newly identified <br />resources were documented and <br />previously recorded resources were <br />documented as part of this project. <br />In addition, effects were evaluated to <br />determine if the project would impact <br />the significant resources. <br />Completed <br />January <br />2019 <br />N/A
The URL can be used to link to this page
Your browser does not support the video tag.