19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Hard Rock Stadium Pedestrian Bridges, City of Miami Gardens
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Structural Project Manager responsible for the design services of two pedestrian bridges substructures, and for the MSE wall control drawings
<br />for the ramps at both bridge approaches. The bridges will facilitate pedestrian access to and from the Hard Rock Stadium which can hold up to
<br />60,000 spectators. The bridge over NW 199th Street is 151’-11” long, while the other bridge over the Turnpike Access Road is 206’-11” long.
<br />Both bridge superstructures are simple span, variable-depth walk-thru steel trusses that are 14’ wide. The substructures consist of pile bents
<br />with 24” prestressed concrete piles. The bridges approach ramps consist of concrete walkways supported by wrap-around MSE walls. Stairs at
<br />the ramp entrances were also provided to facilitate pedestrian access during sport events. Construction on this fast-track Design-Build project
<br />began in mid-January 2019 and is scheduled for completion by the end of September 2019 - just in time for the onset of the NFL regular season
<br />and five months before the stadium hosts Super Bowl LIV. Location: Miami-Dade County, FL.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)I-75 / I-595 Interchange Bridges, Phase II – Broward County, FDOT District 4 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />1985-1987
<br />CONSTRUCTION
<br />1988-1990
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />Design of nine concrete segmental bridges for a four-level fully directional interchange of I-75, I-595, and the Sawgrass Expressway. At 550
<br />acres, this is the largest interchange in Florida. Bridges included both single and twin boxes. Bridges ranged from just under 400 feet to almost
<br />4000 feet in length. Maximum span length exceeded 200 feet. The combined length of the bridges exceeded two miles and bridge deck area
<br />exceeded 600,000 square feet. Pier heights exceeded 60 feet. Project required a total of 1,366 full section 10-foot segments which were cast
<br />on-site and then erected in balanced cantilever fashion. Mr. Hadrous was responsible for the design of all the segments for both the single and
<br />twin box bridges including typical segments, CIP segments, and pier segments. Mr. Hadrous also designed the cantilever and suspended
<br />expansion joint segments, the expansion joint hinge details, and longitudinal closure pours for the twin boxes. Mr. Hadrous was also
<br />responsible for quality control reviews of the design and plans for the Piers for Bridge F2 (8 Spans, 1071 feet).
<br />c.
<br />(1)TITLE AND LOCATION (City and State)Evans Crary Sr. Bridge – Martin County, FDOT District 4
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />1994-1996
<br />CONSTRUCTION
<br />1997-2001
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />The Evans Crary Sr. Bridge has an overall length of approximately 2,982 feet with seventeen continuous spans and a maximum span length of
<br />180 feet. The twin, precast segmental structures are 49’-4¼” wide and are separated by a 1’–6” gap. Each is wide enough to carry two traffic
<br />lanes, two emergency lanes, a bicycle lane, and a pedestrian lane. Rising at a vertical grade of 5.2%, the bridge provides 65 feet vertical and
<br />ninety feet horizontal clearance over the St. Lucie River and Piers were designed for Ship Impact. Box girders are a constant 8 feet in depth
<br />and the bridges are continuous from end to end with no intermediate expansion joints. Mr. Hadrous was responsible for the original design and
<br />detailing of the post-tensioned concrete box girders including typical segments, modified segments and cast-in place segments. He was also
<br />responsible for the segment anchorage details, future post-tensioning details, bridge erection schedules, segment shear key details, and bridge
<br />jacking details.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)Flagler Beach Bridge YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />1993
<br /> CONSTRUCTION
<br />1995
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Bridge Design Engineer Bridge Design Engineer for this high-level post-tensioned 72” Florida Bulb T bridge with 528’ typical superstructure units
<br />with four continuous spans of 132’ each. The bridge included over 25,000 linear feet of girders, 505,000 pounds of post-tensioning and 245,000
<br />square feet of bridge deck. Mr. Hadrous was responsible for analysis, design and plans production for the post-tensioned concrete girders
<br />including tendon geometry and anchorage details. Location: Flagler County, FL.
<br />e. (1) TITLE AND LOCATION (City and State)YEARS COMPLETED
<br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME:Abdulkadir (Abid) Hadrous, P.E.13.ROLE IN THIS CONTRACT:Quality Control 14.YEARS EXPERIENCE
<br />a. TOTAL:36 b. WITH CURRENT FIRM:
<br />9
<br />15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16.EDUCATION (Degree and Specialization):1982 MSCE - Syracuse University
<br />1981 BSCE - Syracuse University
<br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 38648
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):
|