Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) SR-5/US1 from South Street to Magnolia/Shangri-La Drive, Volusia County, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION <br />2016 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Quality Reviewer for design of foundations and approach slabs of two pedestrian bridges, box culvert extension, and post-design services. One <br />feature of the design is aluminum prefabricated truss bridges are recommend to FDOT for the two pedestrian bridges across the creek, and <br />technical special provisions of aluminum prefabricated truss bridges were prepared, since these are the first aluminum pedestrian bridges used <br />in FDOT projects. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) Snake Creek Pedestrian Bridge – North Miami Beach, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> 2008 <br />CONSTRUCTION <br />2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Mr. Li served as Structure Design Engineer and involved in the preliminary concept design and the final design of geometry, pile bent <br />foundation. The new pedestrian bridge crossing the Snake Creek (C-9) Canal at Challenger Park in North Miami Beach replaced a timber <br />structure that was decades old and in dire need of repair. So much so, that the timber structure was closed to traffic for a number of months <br />before its demolition. EAC Consulting assessed the costs of repairing and continued maintenance versus replacing. The economics <br />overwhelmingly proved that replacement would be in the City’s best interest. <br />c. <br />(1) TITLE AND LOCATION (City and State) Miscellaneous Maintenance Repairs of NW 116th Way Bridge Over C-6 Canal, Town of Medley, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION <br />2011 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Structures Engineer for the project which consisted repair of cracks and spalls, retrofit of partial slab top reinforcement between the interior <br />bents, application of FDOT specified epoxy as an overlay to the entire bridge deck, replacement of all expansion joints, replacement of <br />damaged guardrails, repairs of the embankment at the abutments, and milling and resurfacing of the approach roadway to provide a smooth <br />transition pavement to the bridge. EAC also prepared the MOT plans per the project requirements, and provided post-design services including <br />shop-drawing review and construction assistance. <br />d. <br />(1) TITLE AND LOCATION (City and State) I Bridge Design and Plans Preparation for Linton Blvd over the E3 and E3 1/2 Canals <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2001-2002 <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The project includes Structural Design Engineering and plans preparation services for the replacement of Linton Blvd Bridges over the E4 and <br />E3 1/2 Canals. Mr. Li served as Structure Design Engineer. The bridges are being replaced with transversely post-tensioned pre-stressed slabs <br />unit bridges. One bridge is a three span concrete slab structure while the other is comprised of only one span. <br />e. <br />(1) TITLE AND LOCATION (City and State) SR-7/NW 5th Street Bridge Replacement over the Miami River <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2005-2007 <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />The project includes one 150’ bascule bridge, one 34’ approach span at each end with CIP concrete slab, four MSE walls and one seawall <br />around the bridge. Mr. Li served as the Project Engineer and was responsible for the overall design of the approach spans, the MSE walls and <br />the seawall. He designed the MSE walls and the seawall and performed QC for the approach spans structure components. <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Chun Li, PE 13. ROLE IN THIS CONTRACT: Project Engineer Structures <br />14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 18 b. WITH CURRENT FIRM: 18 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): 1999 MSCE in Structural and Foundation Civil Engineering - University of Central Florida <br />1995 MSCE - Geotechnical Engineering - Zhejiang University, P.R., China 1992 BSCE - Zhejiang University, P.R., China <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 63052 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):