My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCA TION (City and State ) Design Pre-stressed Concrete Monorail Bridge YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Structures Engineer The project was the design of the monorail bridge for the city of Tabriz in northwest of Iran. The responsibilities as a <br />structural engineer were: Designed pre-stressed concrete monorail bridge decks, columns and piles. Prepared layouts, drawings and technical <br />reports, assisting projects manager in reviewing shop drawings and reports for general conformance with the structural engineering design <br />concept, and communicating with client to develop and complete the projects. The project submitted to the Tabriz Municipality. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State ) <br />Tehran Metro Stations <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (B rief Scope, Si ze, Cost, etc .) AND SPECIFIC ROLE [ ] Chec k if project performed with current firm <br />Structures Eng ineer Designed Tehran metro stations, D7 and V7 including temporary and main retaining structures. The analysis and design <br />included the soil-structure interaction analysis using PLAXIS 3D software and calculating the seismic loading from soil on stations’ walls. The <br />analysis also included the stability and settlement of the underground stations. The design was performed using FHWAIF-99- 015, ACI 318-05 <br />codes and the results submitted to Tehran Urban and Suburban Operation Co. As a structural engineer, he was also responsible for preparing <br />design reports and drawings for the client. <br />c. <br />(1) TITLE AND LOCATION (City and State ) Design of Reinforced Concrete Slab for Railroad Tunnels YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Structures Engineer This project was to make rail infrastructure in center of Iran compatible with high-speed lines. As a structural engineer, his <br />responsibilities were to design slab track as a replacement for the conventional ballasted track. The analysis and design included the dynamic <br />analysis of the slab under train loading and the design of reinforced co ncrete slab. He also optimized the design of reinforced concrete slab for <br />railroad tunnels resulting in about 5% decrease in costs. The results from 3D models, were presented at the 12th International Conference on <br />Rail Transportation in Tehran in 2010 and awarded the Best Paper Award. <br />d. <br />(1) TITLE AND LOCA TION (City and State) Tehran Metro Retaining Wall YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Structures Engineer Designed the retaining walls for line 3 of Tehran Metro. Three types of retaining walls were designed depending on the <br />geotechnical and loading conditions. The responsibilities included the stability analysis and structural design of the reinforced concrete wall <br />employing AREMA and ACI 318 codes and preparing reports and plans. The results submitted to Tehran Urban and Suburban Operation Co. <br />e. <br />(1) TITLE AND LOCATION (City and State) Supervised Metro Construction YEARS COMPLETED <br />PROFESSIONA L SERVICES <br />2006 <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Structures Engineer The project was the construction of the three underground metro stations of 4th line of Tehran metro. The primary <br />responsibilities were: Materials quality control; Checking plans, drawings and quantities of materials; Checking the accuracy of design <br />calculations; Preparing reports for project manager about project progress; Maintaining construction schedule and reviewing the schedule <br />weekly and monthly; Day-to- day management of the site, including supervising and monitoring the site labor force and the work of <br />subcontractors. <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: <br />Mohammad Fesharaki, EI 13. ROLE IN THIS CONTRACT: Structures Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 5 b. WITH CURRENT FIRM: <br /> 2 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): PhD Structural Engineering, 2017 Florida International University MS Civil Engineering (Track & Structures), 2009 Iran University of Science and <br />Technology (IUST) BS Civil Engineering, 2006 Iran University of Science and <br />Technology (IUST) <br />17. CURRENT PROFESSIONA L REGISTRATION (State and Discipline) NCEES ID 17-947-75 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): <br />
The URL can be used to link to this page
Your browser does not support the video tag.