My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />South Pointe Park <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2005-2009 2010 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS <br />City of Miami Beach John Oldenburg, Former Assistant <br />Director, City of Miami Beach joldenburg@balharbourfl.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br />South Pointe Park is designed as a dramatic, ecologically sensitive park at the south end of Miami Beach. The design is programmed to <br />accommodate both active and passive recreation, with play fields, dune and hammock zones, a playground, and a 20 ft. wide baywalk. <br />An important goal in the Master Plan process was to integrate the park into the urban fabric of the city by strengthening and improving <br />the two major street axes which penetrate the park space. SMDS provided consultation for Master Site Planning, paving materials and <br />site furniture selection, and was the primary landscape architect for the park’s planting and irrigation improvements. The fast-track design <br />process began with Master Planning in April 2005. Project was completed in May 2010. <br />Services: Local Landscape Architect: Master Plan, Planting & Irrigation Improvements, and Construction Phase Services <br />Prime: Hargreaves Associates <br />Size: Approx. 22 Acres <br />Project Cost: $20,000,000 <br />Award: 2010 FNGA Award of Excellence <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE <br />Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect <br />b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE <br />c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE
The URL can be used to link to this page
Your browser does not support the video tag.