My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />9 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Florida Department of Transportation (FDOT) District 6 <br />Biscayne Boulevard (NE 5th Street to NE 13th Street) <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br />2002 2007 <br />23. PROJECT OWNER’S INFORMATION <br />y. PROJECT OWNER <br />Florida Department of Transportation - <br />District 6 <br />z. POINT OF CONTACT NAME <br />Kirk Hoosac <br />aa. POINT OF CONTACT TELEPHONE NUMBER <br />954.776.1616 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />(Include scope, size, and cost) <br /> <br />In order to continue the enhancements of the US 1 Corridor for the City of <br />Miami, Miller Legg developed a streetscape design to unify the area <br />surrounding the American Airlines Arena, Museum Park and the <br />Performing Arts Center. Enhancement of the pedestrian corridor and <br />integration with the existing Roberto Burle Marx paving design, directly to <br />the south, was integral in the design of the project. <br /> <br /> Miller Legg coordinated with the City of Miami during the design process, <br />participated in numerous public involvement and design meetings, and <br />incorporated access management concepts, including limited vehicular <br />access and multi-modal transportation. Improvements included specialty <br />paving, lighting, irrigation and planting elements. This project was part of <br />a multi-year continuing service contract with FDOT District 6. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Miller Legg <br />(2) FIRM LOCATION (City & State) <br /> <br />Ft. Lauderdale, FL <br />(3) ROLE <br /> <br />Prime <br />b. <br />(1) FIRM NAME <br /> <br />Miller Legg <br />(2) FIRM LOCATION (City & State) <br /> <br />Miami, FL <br />(3) ROLE <br /> <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City & State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />d. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City & State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />e. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City & State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />f. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City & State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />STANDARD FORM 330 (1/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.