My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RJ Behar References <br />Reference 1: <br />Client Name: Mr. Jose Sanchez – Director of Streets Division, City of Hialeah <br />Address: 5601 East 8th Avenue, Hialeah, Florida 33013 <br />Phone/Fax: Phone (305) 687-2611 / Fax (305) 687-2632 <br />Email: josanchez@hialeahfl.gov <br />Project Title: Continuous Street Neighborhood Improvements Program <br />Work Performed: Roadway design improvements, roadway reconstruction, streetscape, milling and <br />resurfacing, drainage design, utility coordination, maintenance of traffic, lighting <br />design, decorative lighting, signing and pavement markings. <br />Project Location: City of Hialeah Neighborhoods <br />Year Completed: 2000 – Ongoing <br /> Team Members: Robert J. Behar, PE – Project Manager; Juan H. Vazquez, PE, PH, BCEE – Drainage <br />Engineer; Paola Riveros, PE – Project Engineer; Kira Leon, PE – Project Engineer; <br />Michelle Leon, EI – Project Engineer/Inspections <br />F-4
The URL can be used to link to this page
Your browser does not support the video tag.