My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.R. Aleman References <br />Reference 1: <br />Client Name: Elizabeth Wheaton, City of Miami Beach <br />Address: 1700 Convention Center Drive Miami Beach, FL 33139 <br />Phone/Fax: (305)673-7000 <br />Email: elizabethwheaton@miamibeachfl.gov <br />Project Title: Topographic Survey and SUE for 11th Street <br />Work Performed: As a subconsultant to A & P Consulting Transportation Engineer, FRA provided <br />miscellaneous survey and SUE services along 11th Street in Miami Beach. Services <br />included topographic survey, underground utility survey, and SUE related work. <br />Under miscellaneous survey, three steps were developed: <br />1) Extend the exiting topographic survey to cover the areas where new design was <br />proposed. Topographic survey shows all above ground features and show <br />elevations at 100-foot intervals (at a minimum). Driveways were located, and <br />elevations shown along the right-of-way lines (back of sidewalk) and extend into <br />the properties to the building lines. <br />−Extend topographic survey approximately 150 linear feet north from the <br />existing topographic information at the intersection with Euclid Avenue. <br />−Extend topographic survey 150 linear feet north and south from the existing <br />topographic information at the intersection with Meridian Avenue. <br />−Extend topographic survey 150 linear feet south from the existing <br />topographic information at the intersection with Jefferson Avenue. <br />−Extend topographic survey 100 feet along 11th Street, east from existing <br />topographic information to approximate the most easterly side of the alley <br />on Block 42. <br />2)FRA opened all existing manholes within the pump station area and obtained the <br />invert information, pipe size, and material. FRA also designated all underground <br />utility lines within the pump station area and the adjacent alley. Underground lines <br />were shown on the topographic survey. <br />3)As a final step, FRA extended the topographic survey 150 linear feet north from <br />the existing topographic information at the intersection and alleys within the <br />project areas were developed. <br />−Updated topographic survey provided. Creation of the GDTMRD file using <br />the existing topographic information and combined it with the additional <br />topographic/DTM information to be collected by FRA. <br />−Obtained the drainage and sewer information along the corridor. <br />FRA extended the existing baseline of survey as shown on survey provided easterly <br />to Washington Avenue and Westerly to Alton Road. Right-of-way lines along Lennox <br />Avenue, Michigan Avenue, and Pennsylvania Avenue shown on topographic file. <br />The topographic survey was referenced to Florida State Plane Coordinate System, <br />North American Datum 1983, Adjustment 1990 (NAD83/90). <br />F-6
The URL can be used to link to this page
Your browser does not support the video tag.