My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Constructability Reviews - We will engage our construction engineering team to review the <br />Constructability/60% submittal for construction approach and impacts to key items such as <br />maintenance of traffic, utilities, right-of-way, and public safety. <br />• Quality Control - Our comprehensive quality control and assurance program minimizes plan and <br />specification revisions during construction in-turn minimizing construction change orders. <br />• Post Design Support - Any construction phase related request is prioritized by our staff. We <br />typically respond to RFIs within a day of receipt and our local office staff can be at the project site <br />within an hour. We believe that responsiveness and problem solving approach reduces <br />construction issues and cost increases. <br /> <br />QUALITY CONTROL PROCESS <br />Quality Management Plan (QMP) <br />The objective of the QMP, which we will provide for City and FDOT <br />review 20 days after NTP, is to provide tools to our project team <br />so that our professional services are performed and delivered in <br />accordance with applicable industry standards of care and to the <br />satisfaction of project scope requirements while remaining within <br />the allocated schedule and budget. <br />The project-specific QMP includes the H&H Quality Assurance Plan <br />and the H&H Quality Control Plan. A Project Specific Quality <br />Management Plan front end includes: <br />• Project Summary (scope, schedule, list of key personnel) <br />• Project Deliverables <br />• Witness Points or Other Project Reviews to be performed <br />• Project Specific Procedures, if applicable (unique contract <br />requirements, specific stamps, check lists, etc.) <br />• Project-specific QMPs, once approved by the firm and the <br />client, are unique to the project <br /> <br />D-37
The URL can be used to link to this page
Your browser does not support the video tag.