My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The H&H Bridge Park Team <br />Hardesty & Hanover assembled a team of trusted consultants with the specific relevant experience and <br />qualifications to deliver the Bridge Park project. <br />Relevant Samson Oceanfront Park and SIB Experience <br />•Miller Legg and RJ Behar provided the landscaping and civil engineering services respectively for <br />the Samson Oceanfront Park reconstruction. The specific knowledge of these team members <br />provide for continuity of the Oceanfront park on to the Bridge Park. <br />•UES are providing geotechnical services at the City of Sunny Isles Beach pedestrian bridge at the <br />Government Center. They are also the state leader in the specification and testing of augercast <br />piles through their design in the I-395 signature bridge project in Miami. <br />In addition to their unique technical knowledge of the services required for this project, these team <br />members also provide knowledge of the City’s preferences and processes. <br />E-2
The URL can be used to link to this page
Your browser does not support the video tag.